Page 2
WORCESTER BOSCH: WATER TREATMENT: ABBREVIATIONS USED IN THIS MANUAL: FLUE TERMINAL GUARDS: OIL FIRING TECHNICAL ASSOCIATION: CONVENTIONAL FLUE MANUFACTURERS: SYMBOLS USED IN THIS MANUAL: IMPORTANT HANDLING INSTRUCTIONS: GENERAL HANDLING GUIDELINES: Store the appliance in a dry area prior to installation.
OIL SUPPLY: Note: All dimesions are in metres unless stated otherwise. The maximum pipe run figures are based on using copper pipe with an inside diameter of 2mm less than the Ø. a) Single pipe gravity feed system: b) Double pipe sub-gravity feed system: c) Single pipe suction lift with de-aerator: A top feed oil tank fitted with a de-aerator using an internal non-return valve should have any non-...
CONDENSATE PIPEWORK: A condensate trap is supplied with the boiler for external installation. PRESSURE RELIEF PIPEWORK:...
Page 14
a: INSTALLATION & SERVICE CLEARANCES a: INSTALLATION & SERVICE CLEARANCES: Air supply - CF (Conventional flue): b: COMPARTMENTS: Conventional flue appliances: Venting compartments: MINIMUM AIR VENT AREA (cm²) FOR APPLIANCES INSTALLED IN A COMPARTMENT: *Internal air to and from a space/room inside the building. **External air to and from directly outside the building Conventional flue: Room Sealed flue:...
Page 16
See 'Contact Information' on the inside front cover Not applicable for flue guard information. N/A Not allowed CF Conventional flue RS(H) Room Sealed Horizontal flue RS(V) Room Sealed Vertical flue 1 An opening means an openable element, such as an openable window, or a permanent opening such as a permanently open air vent.
Page 17
NOTE: The flue can be increased in size from the boiler take off point providing the joint is correctly sealed. Never reduce the flue diameter from the boiler take off point Manuafacturers of conventional flue systems suitable for this appliance are listed under 'Contact Information' on the inside front cover.
IMPORTANT: All the previous Pre-Installation sections must be read and requirements met before starting boiler or flue installation. Unpacking: GENERAL HANDLING GUIDELINES: THIS BOILER IS NOT SUITABLE FOR ROOF SPACE OR EXTERNAL INSTALLATION.
CAUTION: Ensure there are no pipes, electric cables, damp proof course or other hazards before drilling. SAFETY: PIPEWORK POSITIONS: NOTE: For servicing purposes, keep the condensate and pressure relief discharge pipes away from components and pipework connections. FLUE OPENING: NOTE: all horizontal flue sections must rise away from the boiler by 52mm per metre to ensure that condensate flows back into the boiler for safe discharge via the condensate waste pipe.
CAUTION: ISOLATE THE OIL & WATER MAINS SUPPLY BEFORE STARTING ANY WORK AND OBSERVE ALL RELEVANT SAFETY PRECAUTIONS. WATER CONNECTIONS: Note: that surplus water may be present due to factory testing. OIL SUPPLY CONNECTIONS: CONDENSATE CONNECTION:...
32/50kW 50/70kW STERLING 133 BURNER SETTINGS: STERLING 146 BURNER SETTINGS: CAUTION: ISOLATE THE OIL MAINS SUPPLY BEFORE STARTING ANY WORK AND OBSERVE ALL RELEVANT SAFETY PRECAUTIONS.OIL BURNER: OIL PUMP: The burner is factory set for a single pipe system. Converting the oil pump to a double pipe system: 32/50kW 50/70kW...
Page 27
DANGER - 230v: ISOLATE THE MAINS ELECTRICITY SUPPLY BEFORE STARTING ANY WORK AND OBSERVE ALL RELEVANT SAFETY PRECAUTIONS. Access to 230v connections: 230v 230v connections: Route the power cable to the connection point avoiding any potentially hot surfaces. 230v Allow sufficient cable for the control panel (A) to be pulled forward for servicing.
Page 28
230v STANDARD WIRING DIAGRAM: Key to components: 1 2 3 3 5 1...
Page 29
PRE-WIRED REMOTE 3 or 2 PORT VALVE CONTROL SETS: Key to components: Remote junction box (A) requirements: A frost thermostat can also be connected to the remote juction box if required. 1 2 3...
Page 30
CAUTION: ISOLATE THE MAINS SUPPLIES BEFORE STARTING ANY WORK AND OBSERVE ALL RELEVANT SAFETY PRECAUTIONS.
Page 32
32/50kW 50/70kW DANFOSS BFP 11 L3 OIL PUMP DANFOSS BFP 52E L3 OIL PUMP Air will be automatically vented when the boiler is started up. BURNER LOCKOUT/RESET...
Page 33
Boiler lockout indicator on: If the boiler fails to establish a normal firing pattern or flame failure occurs the flame monitoring photocell mounted in the burner body will alert the burner control box to shut the burner down and provide a safe lockout state indicated by the illumination of the lockout reset button (E).
Page 34
Central heating: The burner should be ON with the circulating pump. The burner and circulating pump should be off.
Page 35
FLUSHING (Central Heating): INHIBITOR (Central Heating): NOTE: The concentration level of inhibitor in the system should be checked every 12 months or sooner if system content is lost. The addition of sealing agents to the system water is not recommended as this can cause problems with deposits left in the heat exchanger.
Page 36
Handover: Note: Release drain point (K) to drain the secondary heat exchanger.
Page 37
CAUTION: ISOLATE THE WATER, ELECTRICITY AND OIL MAINS SUPPLIES BEFORE STARTING ANY WORK AND OBSERVE ALL RELEVANT SAFETY PRECAUTIONS. Routine servicing: To assist efficient boiler operation, the following should be carried out at least once a year. Operate the appliance and system and note any faults which may need to be corrected during the service.