Drainage Piping Work - Mitsubishi City multi PCFY-P Installation Manual

Air-conditioners for building application indoor unit
Table of Contents

Advertisement

Available languages

Available languages

4. Installing the refrigerant piping
Fig. 4-3

5. Drainage piping work

Fig. 5-2
6
Fig. 5-1
Fig. 5-3
4.3. Indoor unit (Fig. 4-3)
Installing procedures
1. Slide the supplied pipe cover 2 over the gas tubing until it is pressed against the
sheet metal inside the unit.
2. Slide the provided pipe cover 3 over the liquid tubing until it is pressed against
the sheet metal inside the unit.
3. Tighten the pipe covers 2 and 3 at the both ends 3/4 in. (20 mm) with the sup-
plied bands 4.
A Gas tubing
E Pipe cover 3
B Liquid tubing
F Press the pipe cover against the sheet metal.
C Band 4
G Refrigerant tubing heat insulating material
D Pipe cover 2
• For left side tubing, be sure to insert the rubber plug into the right drain port. (Fig.
5-1)
• Use VP-20 (O.D. ø26 (1") PVC TUBE) for drain piping and provide 1/100 or more
downward slope.
• After completion of work, check that correct drain is available from the outflow
port of the drain tubing.
A Drain pan
B Plug
C Insert the driver etc.in the plug deeply.
Installing procedures (Fig. 5-2)
1. Attach the joint socket 5 supplied with the unit to the drain port on the unit with a
vinyl chloride adhesive.
2. Fasten the socket cover 6 supplied with the unit to the joint socket 5.
3. Attach the field drain tubing (VP-20) to the joint socket 5 with a vinyl chloride
adhesive.
4. Wrap the drain tubing cover 7 supplied with the unit. (Seam taping)
A Drain pan
B Drain tubing
C Socket cover 6
D Joint socket 5
E Drain tubing cover 7
F Stopper
G Instertion length 1-15/32 in. (37 mm)
5. Check for correct drainage. (Fig. 5-3)
* Fill the drain pan with water of about 1/4 gal (1 L) from the air outlet.