2.3
E lectrical
S ervice
C onnec1ons
CAUTION
This
i s
a
t hree-‐phase
2 08
V AC
E VSE
c harger.
The
A CT
E V
F ast
C harger
i ncludes
o ver
c urrent
p rotec5on
a s
r equired
b y
t he
N a5onal
E lectric
C ode
and
h as
a n
i ntegrated
U L
l isted
2 00
A mp
b reaker
f or
5 0KW
u nit
a nd
1 00
A mp
b reaker
f or
2 5KW
u nit.
Please
r efer
t o
N EC
A r5cle
6 25
f or
i nstalla5on
r equirements
a nd
c heck
i n
t he
i nstalled
j urisdic5on
f or
any
o ther
e lectrical
r equirements.
GFCI
o n
p anel
m aybe
r equired
i f
n ot
i ncluded
i n
t he
c harge
s ta5on.
Conduit
i s
t o
b e
r outed
p er
N EC
c ode
s tandards
25KW
C harger
2 08VAC
3 Phase
I nput
3
A WG
L ine
f or
e ach
p hase
3
A WG
G ROUND
w ire
Note:
E ach
h ot
l ead
s hould
m easure
1 20
V AC
t o
g round.
Installing
t he
w ires
GROUNDING
I NSTRUCTIONS
–
T his
u nit
i s
t o
b e
c onnected
t o
a
g rounded,
m etal,
p ermanent
w iring
system;
o r
a n
e quipment-‐grounding
c onductor
i s
t o
b e
r un
w ith
c ircuit
c onductors
a nd
c onnected
t o
equipment-‐grounding
t erminal
o r
l ead
o n
b aiery
c harger.
C onnec5ons
t o
t he
c harger
s hall
c omply
with
a ll
l ocal
c odes
a nd
o rdinances.
WARNING
Lockout
/
t agout
a ll
e lectrical
s ource
c ircuits
f eeding
t he
u nits
i n
t he
o pen
p osi5on
b efore
b eginning
wiring
o r
t ermina5ons.
F ailure
t o
f ollow
t he
i nstruc5ons
c ould
r esult
i n
s evere
b odily
i njury
o r
d eath.
WARNING
The
u nit
i s
d esigned
f or
i ndoor
o r
o utdoor
i nstalla5on.
I f
t his
u nit
i s
m ounted
o utdoors,
t he
hardware
f or
c onnec5ng
t he
c onduits
t o
t he
u nit
m ust
b e
r ated
f or
o utdoor
i nstalla5on
a nd
b e
installed
p roperly
t o
m aintain
t he
p roper
o utdoor
/
r ain
5 ght
r a5ng
o f
t he
e nclosure.
Once
t he
e nclosure
h as
b een
s ituated
i n
i ts
i nstalla5on
l oca5on.
*Line
1 ,
L ine
2 ,
L ine
3 ,
a nd
G round
w ires
a re
r equired,
n eutral
i s
n ot
r equired.
CAUTION
The
p hases
u sed
m ust
e ach
m easure
1 20VAC
t o
N eutral.
E arth
G round
m ust
b e
c onnected
t o
N eutral
at
o nly
o ne
p oint,
u sually
a t
t he
S ervice
E ntry
B reaker
P anel.
CAUTION
The
e lectrical
c onnec5on
t o
t he
A CT
E V
C harger
r equires
f our
w ires.
T hree
1 20
V AC
l ines
a nd
a
ground
w ire.
This document is Property of ACT and should not be
copied, reproduced, or used as the basis for sale or
manufacture of apparatus without ACT's written
permission
50KW
C harger
2 08VAC
3 Phase
I nput
3/0
A WG
L ine
f or
e ach
p hase
3/0
A WG
G ROUND
w ire
ACT EV Fast Charger Installation Manual
Page 10 of 22
Rev D