Flashing And Termination - Desa B36 Installation Instructions Manual

36” smooth face 36” smooth face with insulation 36” circulating 36” circulating with insulation
Table of Contents

Advertisement

PENETRATING THE ROOF
To maintain a 1-inch clearance to the pipe on a roof with a
pitch, a rectangular opening must be cut.
STEP 1: Determine the center point through which the pipe
will penetrate the roof.
STEP 2: Determine the center point of the roof. Pitch is the
distance the roof drops over a given span, usually 12 inches.
A 6/12 pitch means that the roof drops 6 inches for each 12
inches one measure horizontally down from the roof rafters.
STEP 3: Use the roof opening chart (figure 12) to determine
the correct opening length and flashing required.
STEP 4: Remove the shingles around the opening measured
and cut out this section.
STEP 5: Add the next sections of the pipe until the end
penetrates the roofline.
clearances are maintained.
sections of double wall pipe until pipe is a minimum of 30
inches above the highest point of the roof cutout. Termination
and chimney must extend a minimum of 36 inches above the
highest point where it passes through roof.
PITCH
SLOPE
(degrees)
FLAT
0
0 - 6/12
26.6
6/12 - 12/12
45.0
Figure 12
ROOF OPENING CHART
FLASHING INSTALLATION (V6F-8DM or V12F-8DM)
Determine the flashing to be used with the roof opening chart.
Slide flashing over pipe until base is flat against roof. Replace
as many shingles as needed to cover exposed area and flashing
base. Secure in position by nailing through shingles (see
figure 13).
DO NOT NAIL THROUGH FLASHING CONE.
Check to see that the proper
Extend chimney by adding
OPENING "A" MAX
USE FLASHING
(inches)
MODEL NO.
15
V6F-8DM
16 - 1/8
V6F-8DM
20 - 3/8
V12F-8DM
INSTALLING FLASHING ON A METAL ROOF
When installing the flashing on a metal roof, it is required that
putty tape be used between the flashing and the roof. The
flashing must be secured to the roof using #8 x ¾" screws and
then sealed with roof coating to prevent leakage through the
screw holes. A roof coating must also be applied around the
perimeter of the flashing to provide a proper seal.
Figure 13
FLASHING INSTALLATION
STORM COLLAR INSTALLATION (SC1 or SC2)
Place storm collar over pipe and slide down until it is snug
against the open edge of the flashing (see figure 14). Use SC1
for all round terminations and SC2 for all terminations with
slip sections. Apply waterproof caulk around the perimeter of
the collar to provide a proper seal.
Figure 14
STORM COLLAR
- 6 -
For more information, visit www.desatech.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vb36Vb36iB36iVb36lB36lCwb36c ... Show all

Table of Contents