Page 4
1 Brief In ntroductio on 1.1Prefac ce This manual will p provide the u users who us se the Growa tt SP2000 en nergy storage e system of G GROWATT NEW W ENERGY TECHNOLOG GY CO.LTD.SH HENZHEN (Sh hort for Grow watt New En nergy as belo ow) ...
Page 5
2. The insta allation of the e Growatt SP 2000 storage e system mus st only be car rried out by s uitably qualif fied installers s. 3. During i nstallation, n no covers or r outer casin ngs should b e ...
Page 6
S P2000 Storag ge System n no other core e components s are required d. Attention: The SP2000 Storage sys stem uses Li thium or Le ead‐acid batt teries to sto re DC electr ricity from t he PV panel ls. Therefore, th he installatio...
Page 7
00 is reliable t to make sure personal safet 2.3 Symb ols introd duction on n the SP20 000 unit symb bol d escription ngerous voltag k of burns! nt of connect tion for ground ding protectio Dire ect Current(D Alte ernating Curre ent(AC) e SP2000 stora age unit comp plies with the requirements s of the plicable CE gu idelines ...
Page 8
3 Produc ct Descrip ption 3.1 Growa att SP 200 00 storage e unit Display an nd labels of SP2000 0 Unit Mark Description Explana ation Tap symbol Tap to operate e SP2000 unit (Detailed in s section 6) ...
Page 9
Description o of label: Prod duct Model owatt SP2000 0 Input voltage range e 00‐580Vdc Max i nput power r...
Page 10
This mus st be reporte ed immediately to the suppli ier. Growatt SP20 000 unit part ts and accesso ories are follo ows: Chart 4. 1 Item m umber Description A ...
Page 11
HThe ambien nt temperatu re should be within ‐25℃ I The SP2000 0 Storage Un nit can be in nstalled in ve ertical or lean ning back po osition, but n not leaning f forward or fl at position. Plea ase refer to t...
Page 12
5.2.1 Insta allation Lay yout The installati on plan for in nstalling the S SP2000 Syste em in a prope erty is as follo ows: The SP 2000 0 needs to b e installed n near the mai ns entry to t the property y.(The red lin ne in the dia gram ...
Page 13
than it) The SP2000 requires an A AC plug point t for AC powe er to the unit...
Page 14
Ф8 holes a 4. Drill four at the marked d points, the depth is a mi inimum of 55 5mm. Ф8 holes(As 5. Fix the fo our expansio n bolts intoФ s the chart 5. 5b below) 6. Hang the e SP2000 unit t on the four fixings(As t the chart 5.5c c below) 7. Lock the nut of setscr rew(As the chart 5.5d be elow) 8. The who ole installatio n has finished d(As the ch art 5.5e belo ow) ...
Page 16
5.3.1 Differ rence betw een Traditio onal Photov voltaic Syst tem and Sto orage Syste m The Growatt t SP 2000 sto orage system m is for use w with single‐ph hase grid‐con nnected strin ng inverters. Up to 3 equ ual strings can b e connected ...
Page 17
In the above the SP2000 u unit, the batt tery pack, and d the sensor ...
Page 18
Chart 5.10 Step 2: Conn ect the outpu ut of SP2000 to the input of your PV in nverter, as th e diagram sh ow: ...
Page 19
Chart 5.13 ease note: A AN AC PLUG P POINT IS REQ QUIRED FOR T THE SP2000 U UNIT 5.4 System m Electric cal Connec ction 5.4.1 SP2 2000 AC pow wer supply ...
Page 21
MS system to o communica ate with the S SP2000 unit, all the runnin ng data will be acquired thr rough the co mmunication n, so temper rature sensor r is not need ed, but a ne etwork cable is ...
Page 25
.5m. 5.4.7 Com mmunication connection b between SP2 2000 and Lith hium battery’ ’s BMS There are co ommunicatio n between S SP2000 and lithium batte ery’s battery managemen nt system(BM MS), so a RJ4 45 network cab le is required d to connect t the battery to o the COM so ocket of SP200 00. Installatio...
Page 26
Step 1. Conn nect the pos itive pole of lead‐acid ba attery to the positive term minal on the e SP2000 uni t, connect th he negative pol e of battery to the nega ative termina al of SP2000.
Page 27
, the battery starts workin ng. 5.5 Groun nding PV Array Gr rounding The frame an nd mounting racks of PV p panels should d be firmly an d securely co onnected to g ground. DC Groundi ing SP2000 storag ge system can n be used in b oth grounding g system and floating syste em. If it is used d in grounding g PV system(P PV positive or ne egative conne cted to groun nd), there mus st be a galvan nic isolation tr ansformer ins stalled betwe en inverter an nd ...
Page 28
1. Che eck the polar rity of PV str ring inputs, t then connect t the PV strin ngs into the SP2000’s inp puts. Keep th he buil lt‐in DC switc ch in OFF pos ition. 2. Con nnect the b battery to th he ...
Page 29
V generation is low or stop pped, then th he system wil l operate nor rmal discharg ge mode. ● When D DC input volt tage is less t than 100V a nd SP2000 u unit has dete ected deman nd from the property, th he controlle er will supply y energy from m the batterie es to the inve erter, which w...
Page 31
Chart 6.4 State four: w with the sunli ght being mo ore stronger, the PV outp ut will be gre eater than pr roperty load plus maximu m charging pow wer of SP2000 0(2kW) , the r residual powe er will be fed t to the grid, po ower flow is sh how as follow w: Chart 6.5 Chart 6.6 Batt ery is fully ch harged ...
Page 32
Chart 6.7 State six: wh hen the sun goes out com mpletely, the e photovoltaic c panel will n not generate e power, Whe en SP2000 ha as detected elec ctricity being g supplied fro m grid, it wil l start discha rging to satisf fy the proper rty’s load, Chart 6.8 ...
Page 33
:The SP2 5、 Fault sta 2000 unit has s detected a f fault, and sto opped operat ing. 6、 Program ming state: The SP2000 unit is being programmed d. The second l ine displays a as follow: In normal sta atus, it scrol ls automatica ally, when ta pping on the e tap sign are ea, ...
Page 34
as billing. 6.4Comm munication n 6.4.1 Use the PlusBu us software to set up th he SP2000 storage con ntroller The PlusBus software can n be downloa ded from dow wnload sectio on of Growat tt official web bsite. ...
Page 36
Chart 6.13 NOTICE: the length of LAN N cable is dec cided by user rs themselves s according to o actual situat tion 7 Start‐u p and shu ut down SP2000 s storage sy ystem 7.1Start‐u up the SP2 2000 stora age system m 1. Switch on AC and DC is olator of the inverter; 2. Plug the A AC power cord d of SP2000 in nto the wall s socket, it will ...
Page 37
If a fault occu urs with your r SP2000 Ene rgy storage sy ystem, please e inform Grow watt and be p prepared to p provide relate ed information i in order to as ssist with fau lt deduction. Our professi onal aftersale es service pe ersonnel will a assist you. Typical inform mation that w will be neede...
Page 39
50W for 10 well inutes 10 Manu ufacturer Warranty y This certifica ate represent ts a 5 year w warranty for t the Growatt products list ed below. Po ossession of this certificat te validates a st tandard facto ory warranty of 5 years fro om the date o of purchase. Warranted products ...
Page 40
GROWATT , u unless such o other obligati ons or liabili ties are expr essly agreed to it in writi ing signed an nd approved by y GROWATT , GROWATT shall have n no responsibi lity or liabilit ty whatsoeve er for damag ge or injury t to persons or p roperty, or fo or other loss or injury resu ulting from a...
Page 41
Warranty C Conditions If a device be ecomes defe ective during the agreed G Growatt facto ory warranty period and p provided tha t it will not b be impossible o r unreasonab ble, the devic ce will be, as s selected by G Growatt: 1、 Shi ipped to a Gr rowatt service e center for r repair; ...
Page 42
spec cification 12.1 Grow watt SP se eries energ gy storage e machine e product specificat tion Model Growat tt‐SP2000 Spec cification PV a rray input a and output data : Input t PV voltage e range ...
Page 44
Laun nchers of Com mmunication d data record R00.0000601 gbee M interface 00.0007000 Wi‐Fi M interface R00.0001400 uetooth M interface R00.0002200 13 Certif icate Growatt SP20 000 apply wi thin the scop pe of the wor rld, So the inv verter have t o satisfy diffe erent countri es and region ns of different s safety standa rds del Certificate e Growatt SP2000 CE,SAA,RCM M ...
Page 45
5. Energy st torage mach ine Display co ontent 6. The man nufacturer an d model of th he battery 7. Battery capacity and connection m mode Growatt New w Energy Tech hnology Co.,L Ltd Building B, J Jiayu Industri ial Zone, 28 G Guangming Ro oad, Longten ng Community y, Shiyan, Bao oan District, S Shenzhen T: + 86 75 55 2951 5888 8 F: + 86 75 55 2747 2131 1 ...
Need help?
Do you have a question about the SP2000 and is the answer not in the manual?
Questions and answers