No
8
Unplug the boiler from the electric outlet.
Open the front cover.
Release the heating water inside the boiler by unscrewing the safety valve below the circulator pump.
Separate the 3-way valve wire jack.
Separate the 3-way valve housing and head by removing the 4 screws on the lower part of the 3-way valve.
Fix the 3-way valve to the 3-way valve housing.
Fix the 3-way valve head by screwing the 4 screws.
Connect the 3-way valve wire jack.
Screw the drain screw below the circulator pump.
Plug the boiler to the electric outlet and after water replenishment, check for water leak.
If everything is fine, close the front cover.
Plug the boiler into the electric outlet.
1. Make sure there is no water leak after assembly.
2. Check the jack connection.
Part name
Replacement steps
Caution
- 86 -
KDB-GOM
3-way valve
Series