Installing Offsets - Lennox Hearth Products MERIT MP-36OD Installation Instructions Manual

36" indoor/outdoor wood burning fireplace merit plus series
Table of Contents

Advertisement

A
1
20'
Max.
B
1
Stabilizer
10' Max.
Offset
Elbow
Figure 45
A
2
C
2
A
1
C
1
A
2
C
2
B
2
A
1
B
1
C
1
Figure 46
Return
Elbow
Chimney
Section
Figure 47
Underside Of Chimney
B
2
Figure 48
FTF8-E30 Return Elbow*
B
1
Chimney Section (S)
FTF8-30 Offset Elbow*
*Part of Offset/Return Package Model FTF8-ES30
Figure 49
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
Joints
4'
No. 8 x 1/2" SMS
6'
B
A

INSTALLING OFFSETS

First, review the Offset Elevation Chart and
Figure 49 for reference.
Step 1. Determine the offset distance where
chimney is to pass through the fi rst
ceiling-dimension "A." To fi nd this
point on your ceiling, fi rst determine
the center point for a vertical chimney
following the instructions for vertical
installation.
Measure height to the ceiling from the
top of fi replace-dimension "B." Use the
appropriate Offset Elevation Chart to fi nd
dimension "A." Mark point where you
will drive your nail to show the center
point for your offset ceiling cut.
Step 2. Proceed by using the Straight Up In-
stallation Instructions for cutting and
framing ceiling and roof openings.
Note: See Framing and Dimension Chart for
the sizes of the ceiling and roof openings. The
size of the roof opening varies with the degree
of pitch of the roof.
Offset Elbow Assembly
Offset elbows install the same as chimney
sections. First, snap the inner section INTO the
preceding inner section of fl ue. Check connec-
tion by pulling up slightly to ensure a tight fi t.
Next, the outer sections snap lock OVER the
preceding outer section of chimney. Again,
check outer section by pulling up slightly to
ensure proper connection is made.
Return Elbow Assembly
Return elbows install the same way as round
terminations and stabilizers:
Step 1. Hold return elbow over top of last
chimney section.
Step 2. Center inner slip section into inner fl ue
pipe-slip down.
Step 3. Center outer-locking section over outer
chimney pipe. Push down until locking
joint has fi rmly engaged.
Step 4. Pull up slightly on return elbow to ensure
locking joint has fi rmly engaged.
Step 5. Secure support straps to framing
members by nailing under tension in
sheer (Figure 50).
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Merit plus mp-36od

Table of Contents