Solar Mounting SySteM Assembly Instructions...
Page 3
Assembly Instructions Fastening to the roof: Flat rooF application All roof structure structural attachm Framed and frameless PV - Modules Framed and frameless PV - Modules systems are desig approved flashing up to the contact a licensed roofer Mount PV™ show attached and flas See Figure 1.1 1.1 Planning: Planning : Base Triangles come in 3 pre-assembled configurations 10°– 15°, 20°– 30°, and 35°– 45° and are adjustable in 5° increments. Base Triangles come in 3 pre‐assembled configurations 10°‐15°, 2 in 5° increments. ...
Page 4
Assembly Instructions Flat rooF application Assembly sequence of the flat roof: Assembly sequence of the flat roof: Framed and frameless PV - Modules Framed and frameless PV - Modules Connecting rails: First, the angle brackets must be assem Assembly sequence of the flat roof: Assembly sequence of the flat roof: First, the angle brackets must be fastening T‐Bolt, nut and washer. Hardw Connecting rails: Connecting rails: fastening T‐Bolt, nut and washer remain loose at this time to allow for ba ...
Assembly Instructions Flat rooF application Module Installation: Framed and frameless PV - Modules Diagonal Strap and Anti‐Slip Hardware Installation: Module Installation: Module Installation: Diagonal Strap and Anti‐Slip Hardware Installation: Diagonal Strap and Anti-Slip Hardware Installation: Module Installation: Diagonal Strap and Anti‐Slip Hardware Installation: ...
Page 7
Assembly Instructions Flat rooF application Framed and frameless PV - Modules Assembly sequence of the flat roof support with Frameless PV Modules: Assembly sequence of the flat roof support with Frameless Key Components: PV Modules: • C-Si End Clamp The assembly sequence for the base rails and preassembled triangles are • C-Si Mid Clamp The assembly sequence for the base rails and pre‐ Assembly sequence of the flat roof support with Frameless PV Modules: the same as described in sections 1.1 to 6.3. See Figure 9.1 • Thin film End Clamp assembled triangles are the same as described in ...
Page 8
Assembly Instructions pitched rooF application Assembly Instructions For framed PV-Modules Pitched Roof Application *for framed PV‐Modules Needed tools and materials Würth Solar’s pitched roof systems are designed from HatiCon Solar’s pitched roof systems are designed from the Angle Bracket up and must be attac the Angle Bracket up and must be attached to an approved • Open Ended Wrenches (10, 13) an approved and properly installed standoff or flashing system of the installer’s choice. ...
Page 9
Assembly Instructions pitched rooF application For framed PV-Modules Telescope and Anti Slip Ha Telescope and Anti Slip Hard Telescope and Anti Slip Hardware Mounting Rail Attachment: Mounting Rail Attachment: Telescope and Anti Slip Hardware Installation: Mounting rails can now be attached Optional: to the angle brackets. To do this, To best adapt the length Mounting rails can now be attached to the angle brackets. To do this, simply insert the T‐Bolt on the simply insert the T-Bolt on the angle of the mounting rails to angle bracket into the C‐Channel on the side of the ...
Page 10
Module Installation: Module Installation: For framed PV-Modules Module Installation: To clamp module to mounting rails, slide end clamps To clamp module to mounting rails, slide onto end of mounting rails. Push the module end clam To clamp module to mounting rails, slide end onto end of mounting rails. Push the mo against the edge of the module frame. Module end Module Installation: onto end of mounting rails. Push the module against the edge of the module frame. M...
Page 11
Assembly Instructions pitched rooF application For framed PV-Modules Assembling System Using Cross Rails: Assembling System Using Cross Rails: Assembling System Using Cross Rails: Assembling System Using Cross Rails: Slide the end clamp onto the vertical mounting rails as shown in section 4.1. Follow the assembly sequence for the horizontal, Follow the assembly sequence for the Afterwards, slide a locking clip onto the end of each vertical mounting rail Assembling System Using Cross Rails: substructure rail described in sections 1 to 3.2. Follow the assembly sequence for the horizontal, Follow the assembly sequence for the horizontal, and fasten it by tightening the screw clockwise. See Figure 5.4 horizontal, substructure rail described in substructure rail described in sections 1 to 3.2. substructure rail described in sections 1 to 3.2. ...
Page 12
Assembly Instructions ground-Mount application Portrait Mode Framed PV-Modules Assembling and Installing t Assembling and Installing the Fo Assembling and Installing th Angled Side View Needed tools and materials If a concrete foundation is prepared, Angled Side View Angled Side View the sinking of the sigma posts with • Cordless Drill, with 7/16 high speed drill bit. rebar requires a reinforced foundation. • Metric Open Ended Wrenches sizes: M(13,17) A hole must be drilled within 8 inches • Metric Allen Wrenches or Driver sizes: M(5,8)
Page 13
Assembly Instructions ground-Mount application Portrait Mode Framed PV-Modules After the frame is complete the sys The previously assembled bearing block and vertical The previously assembled After the frame is complete the sigma post with the supplied M post assembly from step 3 are inserted into the sigma hardware.
Page 14
Assembly Instructions ground-Mount application Portrait Mode Framed PV-Modules Key Components • C-Si End Clamp The designs are based on the following codes: • C-Si Mid Clamp • 2006 International Building Code • Thin film End Clamp • American Society of Civil Engineers 7-05 • C-Si Mid Clamp • 2005 Aluminum Design Manual • Cross Adapter • American Institute of Steel Construction Manual Thirteen Edition • Diagonal Strap • American Concrete Institute ACI 318R-05 • 10°- 15° Triangle...
Page 15
Ground‐mount Application *Landscape Mode Framed PV Modules Assembly Instructions ground-Mount application Landscape Mode Framed PV Modules Assembling and Installing t Assembling and Installing the Fo Assembling and Installing th Angled Side View Needed tools and materials...
Page 16
Assembly Instructions ground-Mount application Landscape Mode Framed PV Modules Attaching Base Rails to Footings: Attaching Base Rails to Footings: Attaching Base Rails to Footings: To line up several system rails with one another, slide the splice halfway onto The previously assembled the assembled system rail. bearing block and Attaching Base Rails to Footings: vertical post assembly Next, slide the other To line up several system rails with one The previously assembled bearing block and vertical slide the splice halfway onto the assem system rail onto the splice from step 3 are inserted The previously assembled bearing block and vertical ...
Page 17
Assembly Instructions ground-Mount application Landscape Mode Framed PV Modules Installing Diagonal Straps: Installing Module Mounting Rails: Installing Diagonal Straps: Installing Diagonal Straps: After the base system rails (ST-AK 120/90) are attached to the bearing Cross bracing is necessary before Diagonal block (east-west), the upper module rails sections (ST-AK 60/37 or ST-AK the modules can be mounted. To Installing Module Mounting Rails: Cross bracing is necessary before the mo Strap 66/37) are attached lengthwise (north-south). This requires 2 cross adapters do this, the M10 hexagon nuts Cross bracing is necessary before the mo mounted. To do this, the M10 hexagon n per intersection point. and the serrated lock washers mounted. To do this, the M10 hexagon n serrated lock washers on the head of the...
Page 18
Assembly Instructions ground-Mount application Landscape Mode Framed PV Modules Click Click Click Installing the Modules: Installing the Modules: Installing the Modules: Now, slide the next module under the mid Starting along the lower left or right corner clamp. Next, adjust the mid clamp to the of the table, slide the end clamp onto the module height, and tighten the hardware Starting along the lower left or right corner of th clockwise. See Figures 10.5 & 10.6 end of the module mounting rail (ST-AK ...