INSTALLATION INSTRUCTIONS
Table 13
Approved Combustion-Air and Vent Pipe, Fitting and Cement Materials (U.S.A. Installation)
ASTM
SPECIFICATION
MATERIAL
(MARKED ON
MATERIAL)
ABS
D1527
PVC
D1785
For ABS
D2235
PVC
D2241
PVC
D2466
ABS
D2468
For PVC
D2564
ABS
D2661
PVC
D2665
CPVC
F438
CPVC
F441
CPVC
F442
For CPVC
F493
ABS
F628
For PVC
F656
PVC
F891
Vent Coupling and Adapter with
Figure 41
Gaskets
Attach gaskets to vent pipe and combustion air adapters
Vent Coupling and Adapter
38
SOLVENT CEMENT AND
PIPE
FITTINGS
Pipe
−
Pipe
−
−
−
Solvent Cement
Pipe
−
−
Fittings
−
Fittings
−
−
Solvent Cement
Pipe
Fittings
Pipe
Fittings
−
Fittings
Pipe
−
Pipe
−
−
−
Solvent Cement
Pipe
−
−
−
Pipe
−
A13074
Specifications subject to change without notice.
PRIMERS
−
−
−
−
−
−
DWV at Schedule−40 IPS sizes
−
−
−
−
Cellular Core DWV at Schedule−40 IPS
−
Primer
−
Cellular Core Schedule−40 & DWV
Figure 42
Vent Pipe Flush with Adaptor
VENT PIPE ADAPTER WITH GASKET INSTALLED ON FURNACE.
VENT PIPE IS CUT FLUSH WITH TOP OF ADAPTER. PRIME AND
CEMENT VENT PIPE TO ADAPTER. ALLOW TO DRY BEFORE IN-
STALLING VENT COUPLING.
Figure 43
Vent Pipe Flush Showing Coupling
ALIGN NOTCHES IN VENT PIPE COUPLING OVER STAND−
OFF ON ADAPTER. TORQUE LOWER CLAMP 15 LB−IN. WHEN
REMAINING VENT PIPE IS INSTALLED, TORQUE UPPER
CL AMP TO 15 LB−IN.
Gas Furnace: N9MSE
DESCRIPTION
Schedule−40
Schedule−40
For ABS
SDR−21 & SDR−26
Schedule−40
Schedule−40
For PVC
DWV
Schedule−40
Schedule−40
SDR
For CPVC
sizes
For PVC
A13076A
A11339B
440 01 4103 03