Summary of Contents for Brookstone Beans and Leaves
Page 1
Find thousands more great ideas online Beans and Leaves 842432 Coffee or Tea Maker Merrimack, New Hampshire USA 03054 • 800-846-3000 • Brookstone.com...
Page 2
Brookstone may provide their own warranties to the purchaser, but Brookstone, in so far as permitted by law, provides these products “as is.” Safety Precautions ..............1 This warranty does not apply to: a) damage caused by failure to follow instructions Location of Parts and Controls.
(“Warranty Period”). If a defect arises and a valid claim is received • TO REDUCE THE RISK OF FIRE OR ELECTRIC SHOCK, DO NOT EXPOSE within the Warranty Period, at its option, Brookstone will either 1) repair the defect THIS UNIT TO RAIN OR MOISTURE.
TROUBLESHOOTING amplifiers) that produce heat. Avoid placing on top of stereo equipment that radiates heat. ISSUE SOLUTION 8. The cord for this unit should be plugged into a 120V AC outlet only. Unit does not brew. Ensure there is water in the WATER RESERVOIR. 9.
FCC INFORMATION seconds then turn solid. Brewing will start within 15 seconds. When brewing is complete the COFFEE INDICATOR LED will turn off. This device complies with Part 15 of the FCC Rules. Operation is subject to the 6. Discard the water from the TRAVEL MUG. following two conditions: Lift the LID and fill the WATER RESERVOIR with cold water only to the 1) This device may not cause harmful interference.
EMPTYING THE WATER RESERVOIR WARNING: To comply with FCC’ s RF radiation exposure limits for general population/ uncontrolled exposure, the antenna(s) used for this transmitter must be installed to Unplug the unit. provide a separation distance of at least 20 cm from all persons and must not be col- 2.
LOCATION OF PARTS AND CONTROLS 9. Press the BREW BUTTON. The selected TEA STEEP TIME LED INDICATOR will flash for a few seconds then turn solid. Brewing will start within 15 seconds. When brewing is complete the TEA STEEP TIME LED INDICATOR will turn off. Note: Water Max Fill Line •...
LOCATION OF PARTS AND CONTROLS MAKING TEA Plug the unit into a wall outlet. Basket 2. Lift the LID and insert the BASKET with the TEA FILTER RESERVOIR Water Reservoir facing towards the front of the unit. Coffee Filter Lid Coffee Filter (Color: Black) 3.
MAKING COFFEE Immediately after the brewing cycle, the LID will be hot. Use caution when handling. Plug the unit into a wall outlet. 2. Lift the LID and insert the BASKET with the COFFEE FILTER RESERVOIR facing towards the front of the unit. 3.