Boiler Room - Delta Performance F25 Installation, Operating & Servicing Instructions

Table of Contents

Advertisement

7
USER GUIDE
Fig. 24: Oil burner reset button
If the burner is not working, isolate the electricity
supply before attempting to reset the safety thermostat.
4. Remove the front panel and reset the safety thermostat located on
the top of the boiler.
Wait until the boiler temperature drops below 60°C. Then
replace the front panel.
Fig. 26: Safety thermostat reset button.
5. If the burner is working, replace the burner cover.
6. If the fault persists, please notify the installing engineer.
Starting the burners.
In normal operation, the gas burner starts up automatically provided
that the boiler temperature falls below the set point.
To ensure your system operates properly, have it
professionally serviced once a year before the cold
weather starts.
7.1

BOILER ROOM

Keep vents free at all times.
Do not store any inflammable products in the boiler room.
Take care not to store any corrosive products, such as paints,
solvents, chlorine, salt, soap and other cleaning products, near the
boiler.
If you smell gas, do not switch on the light or light a flame. Turn off
the mains gas tap at the meter and inform the appropriate
services immediately.
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

F35F45

Table of Contents