Other Management Options; Planning Switch Stacks - Cisco Catalyst 3750-E Getting Started Manual

Hide thumbs Also See for Catalyst 3750-E:
Table of Contents

Advertisement

Other Management Options

You can use SNMP management applications such as CiscoWorks Small Network Management
Solution (SNMS) and HP OpenView to configure and manage the switch. You also can manage it
from an SNMP-compatible workstation that is running platforms such as HP OpenView or
SunNet Manager.
The Cisco IE2100 Series Configuration Registrar is a network management device that works with
embedded Cisco Networking Services (CNS) agents in the switch software. You can use IE2100 to
automate initial configurations and configuration updates on the switch.
See the "Accessing Help Online" section on page 23 for a list of supporting documentation.
5

Planning Switch Stacks

Before connecting the switches in a stack, keep in mind these stacking guidelines:
• Size of the switch and any optional power supply module. The 1150-W power supply module is
longer than the other modules. Stacking switches with the same power supply modules together
makes it easier to cable the switches.
• Length of cable. Depending on the configurations that you have, you might need different sized
cables. If you do not specify the length of the StackWise cable, the 0.5-meter cable is supplied. If
you need the 1-meter cable or the 3-meter cable, you can order it from your Cisco supplier.
• Access to the switch rear panel and to the rear of the rack if you are planning to stack the switches.
If you do not have access to the rear panel, make sure that you cable the switches before you
rack-mount them.
• For switch stacks that are rack-mounted, review this recommended sequence of events:
If you are using the RPS 2300, install the RPS first at the bottom of the stack. If needed, allow
one RU space between the RPS and the first switch above to provide room for cabling.
Connect all the 22-pin RPS cables to the RPS 2300 as needed.
Rack-mount the switches. If you have the optional 1150-W power supply module, first
rack-mount the switch before installing the power supply module.
Connect the RPS cable to the first switch above the RPS 2300. Connect the stack cables to the
first switch above the RPS.
Connect the RPS cable to the next switch above the RPS 2300. Connect the stack cables to the
next switch above the RPS.
Repeat until all devices are connected.
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 3750e-48

Table of Contents