Download Print this page

CAMBRIDGE Pre-Packaged Olde English Paver Fireplace Kit Deluxe Surround Instruction Manual page 51

Advertisement

Olde English Paver Fireplace Kit Deluxe Surround
Medallion Installation For Fireplace Kits
Once you have allowed the adhesive to dry for 24 hrs on the fireplace kit you can now install the medal-
lion. You will need a 15' ratchet strap to hold it in place while the adhesive dries. Take measurements
from top to bottom and right to left of the chimney to find the center. Take the strap and put it around
the chimney loosely. Apply concrete adhesive to the back of the medallion and position the orientation
either square or diamond then hold it in place. With another person, position the strap over the medal-
lion around the chimney and ratchet the strap to hold it in place.
*Allow 48 hrs for adhesive to dry then remove ratchet strap.
Una vez que usted ha permitido que el pegamento se seque por 24 horas en el kit de la chimenea usted
puede ahora instalar el medallón. Usted necesitará correa del trinquete 15' sostenerla en el lugar mien-
tras que el pegamento se seca. Lleve las medidas de arriba a abajo y derecho a la izquierda de la chime-
nea encontrar el centro. Tome la correa y póngala alrededor de la chimenea libremente. Aplique el
pegamento concreto a la parte posterior del medallón y coloque el cuadrado de la orientación u o el dia-
mante después lo lleva a cabo en el lugar. Con otra persona, coloque la correa sobre el medallón alrede-
dor de la chimenea y ratchet la correa para sostenerla en el lugar.
*Permita que 48 horas para que el pegamento entonces se seque quitan la correa del trinquete.
Cambridge Pre-Packaged
50
15' tie down strap over the medallion and
around all 4 sides of the chimney
15' atan la correa sobre el medallón y al-
rededor de los 4 lados de la chimenea
2011

Advertisement

loading