Forno Rustico 120 Installation Instructions page 4

Advertisement

Forno Rustico 120 -
CONCRETE MASONRY ASSEMBLY
Lose Expanded Clay
Vermiculite:
Mix Ratio 10 cu.ft.
to 45 lbs. Portland Cement
6" Minimum.
Ceramic Insulation
Blanket
Fire Bricks or Ceramic Fiber
Board
4" Concrete Slab w/ #3
Bars @ 12" O.C. each way
16"
6" Concrete Slab w/ #3
Bars @ 12"O.C. Each way
or
12" wide x 12" deep Concrete
Footing w/ 2- #4 Bars
Undisturbed or
Compacted Earth
Notes:
combustible material and masonry wall if enclosed.
48" Min
Oven Front Arch
Oven Door
Oven Shelf
Fire Brick or
Insulation Board
12"
8" Class A Chimney Pipe (UL103 APP.)
or Fire clay lue lined
Masonry Chimney
6" Min.
48"
Max
12"
Approved Spark Arrest
Solid Water
Provide minimum of 2" air gap between
Masonry lue line*
Proof Cover
Do NOT place any Structural load directly on oven.
12"
(760) 305-8082 • www.dolcevitaspecialtyimports.com
Concrete Masonry Assembly
Oven Dome
Oven Floor
4" or 6" Concrete Blocks,
Grout All Cells
4"
#3 Rebar
16" O.C. Horizontal
#4 Rebar
32"
24" O.C Vertical
6"
76
Vent
Lose Vermiculite or
Expanded Clay- 6" min.
Ceramic Insulation
Blanket
4"
enclosed. Depending on local building codes.
Finished Oven Floor
42"-44" (as desired)
6"
12"
Notes:
The finished oven floor
height should be between
42"- 44" or as desired.
74
"
"
Smoke
Vermiculite, Perlite
or Expanded Clay
Notes:
Provide minimum of 2" clearance between
combustible material and masonry wall if
*If the flue goes through a wood framed structure,
such as a patio cover, use UL approved 103HT
Class A venting, anchor plate and spark arrestor.
Do NOT place any Structural
load directly on oven dome.
6" Block
Ceramic Fiber
Insulation
Door
12" Overhang