Golden Eagle GE200B Installation & Operator's Manual page 3

America’s finest multi-fuel burning heaters
Table of Contents

Advertisement

Assemble trim pieces as shown with the screws
provided in the parts bag.
2
B
A
2
USSC
PEDESTAL TRIM ASSEMBLY
ASH PAN ASSEMBLY
1
Assembly
1. Unpack unit and make sure all components are included; (4) Legs,
and all hardware for installation.
2. Fold the corner padding from the carton and lay it on the floor behind
the unit. This is used to hold the heater up off the floor to install the
legs. Gently tilt the heater on its back, door opening up.
3. Assemble the legs as shown using the eight(8) 1/4-20 bolts supplied.
4. After all bolts and screws have been tightened properly, carefully
set the heater back up on the legs.
1
After trim assembly, attach to the pedestal base at the
location shown using the screws provided.
B
A
3