8. Once the HPTO housing is piloted and
flush with the engine housing, you can
remove the crane support.
9. Install customer supplied sheave and
QD bushing to the output shaft of the
HPTO.
Insure
installed) will be aligned and track
straight.
10. Tension Belts according to Equipment
Manufactures specifications.
11. Install
proper
supplied by PT Tech®).
12. The Manifold Assembly has been
preinstalled on the HPTO Clutch at the
factory.
Do not remove the manifold
unless rebuilding the HPTO unit. See
manifold drawing provided for hose
fitting sizes and connection locations.
13. Install the Microprocessor Controller
and
all
electrical
Controller I&M Bulletin.
Hydraulic Instructions
Refer to the manifold and hydraulic
schematic
provided
connections.
14. All hoses must be thoroughly flushed.
All hoses should be ½" diameter
minimum that are connected to the
"inlet" and "tank" ports on the manifold.
(All hose is customer supplied.)
15. Connect all hoses per the hydraulic
schematic provided.
16. Insure that the hydraulic fluid reservoir
is filled to the proper fluid level.
that
belts
(once
safety
guards
(not
wiring
per
the
for
all
hydraulic
17. Insure that there is a clean 15-micron
minimum oil filter in the hydraulic
system.
3 of 3
I & M BULLETIN
HPTO8TD-100
HYDRAULIC POWER TAKE-OFF
9/11/2007