Download Print this page

Sanyo HIT Power 205 HIP-205BA19 General Installation Manual page 6

Advertisement

General Installation Manual
© July 1, 2008. SANYO Energy (USA) Corp. All Rights Reserved.
SPECIFICATIONS
Dimensions in mm
Front
Note: A module should be installed on a mounting structure
rail, using four (4) symmetrical mounting points within Range A.
Dimensions
All HIT Power Models
Mount Locations
Side
Range A
Figure 2. Dimensions
HIP-xxxBA19)
(
Junction Box
Label
Negative (-)
Positive (+)
63cm (24.8in)
78cm (30.7in)
Connector (MC
Plug)
TM
Ground (4 places)
Backside
6
Section A-A'
Section B-B'

Advertisement

loading

This manual is also suitable for:

Hit power 200 hip-200ba19Hit power 190 hip-190ba19Hit power 195 hip-195ba19Hit power 186 hip-186ba19Hit power 180 hip-180ba19