Installation; Required Tools; Selection Of The Best Location - LG AVNH-EL Service Manual

Universal system air conditioner
Table of Contents

Advertisement

8. Installation

• Please read this instruction sheet completely before installing the product.
• When the power cord is damaged, replacement work shall be performed by authorized personnel only.
• Installation work must be performed in accordance with the national wiring standards by authorized personnel only.
Required Parts
• Connecting cable
• Pipes: Gas side
Liquid side
• Hanging Bolt
(W 3/8 or M10 length 650mm)
• Insulated drain hose
• Additional Drain hose
(Inner Diameter ...........................32mm)

8.1 Selection of the best location

• There should not be any heat source or steam near the
unit.
• There should not be any obstacles to the air circula-
tion.
• There should be provision of easy condensate drain.
• Taking into accounting the noise prevention criteria,
spot the installation location.
• Do not install the unit near the door way.
• Keep proper distances, of the unit, from ceiling, fence,
floor, walls and other obstacles as shown in figure.
• The indoor unit must have the maintenance space.
Air
Intake
Air Outlet
Anti-bacteria filter

Required Tools

• Level
• Screw driver
• Electric drill
• Hole core drill (ø70mm)
• Flaring Tools set
• Torque Wrenches
• Hexagonal Wrench (4mm, 5mm)
• Gas-leak detector
• Owner's Manual
• Thermometer
Ceiling
Ceiling Board
50 or
more
Ceiling Cassette 4-way
Ceiling Board
50 or
more
Unit:cm
Floor
Service Manual 29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents