Jamestown J1000B Owner's Manual page 30

Table of Contents

Advertisement

13. Slide the Stove into its final position while guiding the installed vent system through the wall thimble. Refer to
Chapters III and IV (Clearances to Combustible Materials Requirements) to ensure that the final position of the stove
adheres to all the listed clearance requirements.
14. Check for wall thimble fit around the 4-3/4" (121mm) pipe, adjust as necessary and secure the wall thimble pieces
to the wall using eight screws designed for your wall material type.
15. Fill any gaps between the wall thimble and the 4-3/4" (121mm) pipe with RTV silicone.
16. Slide the 4-3/4" (121mm) End Cap/Rodent Screen (part# 11) so that the sleeve fits inside the end of the 4-3/4"
(121mm) pipe extension and the 3" (76mm) exhaust pipe slides through the 3" (76mm) hole at the center of the End
Cap. Secure the cap in place using one #8 x 1/2" Teck Screw through the side of the 4-3/4" (121mm) pipe.
17. Slide the 3" (76mm) Double Wall Rain Cap (part # 9) over the end of the 3" (76mm) exhaust pipe with the open
end of the cap facing downward at an angle, as shown in Figure B. Secure the Rain Cap to the 3" (76mm) exhaust
tube using three #8 x 1/2" Teck Screws. Space the screws evenly around the 3" (76mm) tube.
Installation of the Coaxial Through-The-Wall 45 Degree Vent System is now complete. Check the entire exhaust
system to ensure that there are no exhaust gas leaks.
Page 22
1998-2006 Edition

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Jamestown J1000B

This manual is also suitable for:

J2000t

Table of Contents