Download Print this page

Advertisement

Quick Links

INSTALLATION AND OPERATION MANUAL
INTEGRATOR RACKS

Advertisement

loading
Need help?

Need help?

Do you have a question about the integrator racks and is the answer not in the manual?

Questions and answers

Summary of Contents for AUSTRALIAN MONITOR integrator racks

  • Page 1 INSTALLATION AND OPERATION MANUAL INTEGRATOR RACKS...
  • Page 2: Important Safety Information

    IMPORTANT SAFETY INFORMATION PRÉCAUTIONS DURANT UTILISATION Read these instructions. LISEZ ces instructions. Keep these instructions. Tenez ces instructions. Heed all warnings. Notez tous les avertissements. Follow all instructions. Suivez toutes les avertissements. Do not use this apparatus near water. N’utilisez pas ce produit près de l’eau (la piscine, la plage, le lac, etc.). Clean only with dry cloth.
  • Page 3: Introduction And Contents

    INTRODUCTION AND CONTENTS INTEGRATOR RACKS INTRODUCTION The Australian Monitor Integrator range of equipment racks are a UNPACKING sturdy and professional rack mounting solution. PREPARING THE TOP PIECE Available in wall mount versions of 6 and 12 rack unit heights and...
  • Page 4: Unpacking The Boxes

    4 x M5x10 screws for mounting top lock catches 4 x M4x8 screws for mounting side lock catches 2 x studs for mount front/rear door NOTE: When assembling the rack it is essential that an electric power drill is used. PAGE 4 INTEGRATOR RACKS INSTALLATION AND OPERATION MANUAL...
  • Page 5 B: Once the inner fan try has been removed the plastic corners need to be removed. This can be done by removing the 4 x M4x8 gold screws used to hold them in. INTEGRATOR RACKS INSTALLATION AND OPERATION MANUAL PAGE 5...
  • Page 6 The wheels or stand offs mount to the bottom of the bottom piece. The stand offs simply screw into the bottom piece. The wheels on the other hand will need to be screwed into the based with the 16 x M6x10 silver self tapping screws. PAGE 6 INTEGRATOR RACKS INSTALLATION AND OPERATION MANUAL...
  • Page 7 To mount the catch simply remove the screw from the rear of the barrel lock and place the lock catch on the square shaft. The lock catch mounts with the tongue facing the top of the panel. INTEGRATOR RACKS INSTALLATION AND OPERATION MANUAL PAGE 7...
  • Page 8 NOTE: It is suggested that one screw be installed halfway followed by the second screw as to stop the small metal piece from spinning on one screw causing damage to the rack and installer. PAGE 8 INTEGRATOR RACKS INSTALLATION AND OPERATION MANUAL...
  • Page 9 Mounting the bottom to the side panels With the corners removed from the bottom piece you can use the 8 x M8x25 hex bolts supplied in the accessories to mount the bottom to the side frames. INTEGRATOR RACKS INSTALLATION AND OPERATION MANUAL PAGE 9...
  • Page 10 Make sure the door freely swings fully open. PAGE 10 INTEGRATOR RACKS INSTALLATION AND OPERATION MANUAL...
  • Page 11: Specifications

    Walls and mounting surfaces must be capable of safely and securely supporting the load of the rack and its contents. Fixings must be safely attached to both the rack and the wall or surface the rack is to mount off. Fixings must be fitted in accordance with the makers instructions. INTEGRATOR RACKS INSTALLATION AND OPERATION MANUAL PAGE 11...
  • Page 12 ENGINEERED BY AUSTRALIAN MONITOR Address: 1 Clyde Street, Silverwater, Sydney NSW 2128 Australia. Private Bag 149, Silverwater NSW 1811 ABN 78 001 345 482 Website: www.australianmonitor.com.au International enquiries email: international@australianmonitor.com.au DISTRIBUTED IN AUSTRALIA AND NEW ZEALAND BY HILLS SVL www.hillssvl.com.au...