Ready Access Access Air 100 Installation, Operation And Service Manual

Ready Access Access Air 100 Installation, Operation And Service Manual

Air curtain system

Advertisement

AA100
Access Air 100
Air Curtain System

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Access Air 100 and is the answer not in the manual?

Questions and answers

Summary of Contents for Ready Access Access Air 100

  • Page 1 AA100 Access Air 100 Air Curtain System...
  • Page 2: Table Of Contents

    TABLE OF CONTENT Topic Page Disclaimer Serial Number Identification Introduction Product Information Specifications Dimensions Safety Information Installation Procedures Physical Installation Electrical Installation Operations Modes of Operation Maintenance Maintenance Schedule Daily Monthly Yearly Service Troubleshooting Guide (Cause and Effect) Parts Lists Parts List (Description/Part Number) Schematics Electrical Wiring Diagram / Warranty...
  • Page 3: Disclaimer

    DISCLAIMER Ready Access Disclaims any Liability for any damage or harm caused to the AA100 Air Curtain, it’s operator or any other equipment however caused if the AA100 Air Curtain is repaired or serviced by anyone other than an authorized service engineer or Contrary to the manufacturers written instruction contained herein.
  • Page 4: Product Information

    Product Information SPECIFICATIONS AND PERFORMANCE Model Unit Voltage Actual Dimensions Weight Number Unit Velocity In Inches In Shipping Amps W x H x D Carton High / Low AA100 110/120 VAC 2000/1800 See Below 29 lbs 60Hz FPM at Nozzle Single Phase Dimensions 22"...
  • Page 5: Installation Procedures

    Installation Procedures PHYSICAL INSTALLATION Before you begin installing your Ready Access Air Curtain, you must determine what type of installation will be required. Wood Frame, Masonry Framing, etc. See the illustration below to determine your rough opening size and mounting.
  • Page 6 CONFIRM THAT THE CUSTOMER-SUPPLIED FRAME IS MADE TO ACCOMMODATE THE DIMENSIONS AS ILLUSTRATED ABOVE. 1. Unpack AA100 unit from carton and inspect for shipping damage. Contact Ready Access as soon as possible if damage has occurred. (800) 621-5045 2. A rough opening of 22-1/4" (565 mm) W x 12" (305 mm) H must be constructed before installation of AA100 unit.
  • Page 7: Electrical Installation

    Electrical Installation All power must be connected and wired by a qualified electrician and be in compliance with all state and local building codes. Remove the (4) #2 phillips drive screws from the inside cover. Located in the upper right hand of AA100 unit, will be an electrical entry junction box. Remove cover and expose (1) black wire (HOT), (1) white wire (COMMON) and (1) green wire (GRD).
  • Page 8: Modes Of Operation

    The unit functions as a “Fly Fan”. If the AA100 does not operate correctly, go to the troubleshooting guide in this manual. If the AA100 still do not operate properly, then call Ready Access at 1-800-621-5045 Each operator must read the operations manual before operating the unit.
  • Page 9: Service

    SERVICE Probable Cause Resolution Issue No Fan Operation. No power to the unit. Check / Reset the main circuit breaker or switch. Switch does not Illuminate Defective Main Switch. Replace the switch. Switch Option is not operating. Find and correct problem. No Fan Operation.
  • Page 11 Problems caused by improper installation are the responsibility of the installer or contractor and will not be covered under warranty. Ready Access, 1815 Arthur Drive, West Chicago, Illinois 60185, Tel: 630-876-7766, Tel: 800-621-5045 Fax: 630-876-7767, Email: ready@ready-access.com, Website: www.ready-access.com...
  • Page 12 Ready Access, 1815 Arthur Drive, West Chicago, Illinois 60185, Tel: 630-876-7766, Tel: 800-621-5045 Fax: 630-876-7767, Email: ready@ready-access.com, Website: www.ready-access.com AA100 INSTALLATION SERVICE OPERATIONS MANUAL 11_19_08...