AFTER USE ..............................19 CLEANING ............................19 CHECK APPARATUS .......................... 20 RECORD TEST DETAILS........................20 STORAGE............................20 SCHEDULED MAINTENANCE........................21 MONTHLY............................21 ANNUALLY ............................21 Registered office: Scott Health and Safety Limited, Pimbo Road, West Pimbo, Skelmersdale, Lancashire, WN8 9RA, United Kingdom.
This manual is for use by personnel trained in the use and care of compressed air breathing apparatus, and MUST NOT be used as a self-teaching guide by untrained users. Failure to understand or adhere to the Pro-Pak user instructions may result in injury or death.
4 x (300 + 150) = There is an increased fire risk when the 1800 litres/minute. oxygen content is above the value shown An airline flow tester is available from above. Scott Health and Safety Limited under Article Number 1035978.
PVC hoses, in lengths ranging from 15m 60m. Customer Services SERVICING Department will be pleased to advise on price and delivery. Pro-Pak must be serviced at scheduled intervals personnel have APPARATUS DURATION completed a formal training course and hold a current certificate for the servicing...
EN 139 : 1995 - Self-contained Breathing Apparatus with airline CYLINDER BAND attachment when there Pro-Pak can be configured for use with intermediate split connection in the one or two (Duo) 200, 207 or 300 bar, airline between steel or fully wrapped aluminium carbon Pressure Reducer.
Page 7
2460 12.0 2460 Note: Only cylinders in the shaded areas (above) are suitable for use with Pro-Pak Duo in the twin-cylinder configuration. The total apparatus weight must not exceed 18 kg when fully- charged; (ref: EN 137, Clause 5.4). Table 3: Cylinders approved for use with Pro-Pak apparatus Table 4 identifies the cylinder material code and cylinder specification.
PRO-PAK warning whistle sounds when THE PNEUMATIC pressure in the cylinder falls to 55 bar (±5 SYSTEM bar). The pneumatic system has two pressure The duration of the air remaining in the reduction stages: air from the cylinder is cylinder, from the start of the warning...
This reduces the duration of the cylinder supply. • Airline attachment (AL) - permits Pro-Pak to be used with an airline. The cylinder provides emergency backup. Note: Air for use with airline must conform to Vision 3 Facemask with Web Harness Breathable Air as detailed in Section 1.
Velcro retainers are closed. Fully slacken the waistbelt and shoulder straps ready for use. When Pro-Pak is to be used with an airline check that: The airline is in good condition, free from splits, bulges and abrasions.
PRO-PAK Remove the cylinder by sliding it Should it become necessary to adjust the through the loosened cylinder band in size of the cylinder band: either direction, as desired. Ensure that the clamp mechanism is unlocked and in the open position.
Page 12
PRO-PAK Manoeuvre the cylinder valve end Slide a fully-charged cylinder along of the remaining cylinder to allow removal the backplate and through the loosened cylinder band. Position the cylinder outlet of the Duo manifold from the cylinder through the cylinder valve retainer.
PRO-PAK Grasp the cylinder band near to the Unscrew central cylinder slide buckle and pull firmly to securely connector from the Duo manifold. Store retain the cylinder furthest from the clamp the manifold safely for future use when mechanism. the Duo application may be required once again.
PRO-PAK Fit a single cylinder as described in Section 3.2 of this Manual. To convert from single cylinder to Duo cylinders, carry out the reverse of the above sequence of operations. RESET DEMAND VALVE Pass the excess cylinder band between the backplate and backpad, at the point where the centre-straps retain the pad to the backplate.
PRO-PAK Close cylinder valve Fit the DV to the facemask and monitor the pressure gauge for one check that the red locking catch engages minute. If the reading falls by more than fully. Twist the DV gently to confirm that it 10 bar during this time there is an has.
PRO-PAK 3.7.3 Facemasks with a Net POSITIVE PRESSURE Harness TEST With the cylinder valve open, insert Hold the mask by the side of the a finger under faceseal and check for a net harness, place the chin into the chin- steady outward flow of air.
Press the DV reset buttons on the Check that the whistle sounds wearer facemask and rescue mask. clearly as the pressure gauge falls below Open the Pro-Pak cylinder valve 55 bar (±5 bar). and check that the RSM connection does The apparatus is now fully tested not leak.
Specialist Users (such as Emergency Services) operate alternative donning procedures that conform to the relevant statutory regulations and have been approved by Scott Health and Safety Limited. Check that Pro-Pak facemask harnesses are fully slackened and that the DV is connected to the facemask.
PRO-PAK Hold head-harness lower straps, place chin in chin-cup and pull straps over back of head, brushing hair away from faceseal. Tighten harness side straps. DO NOT over-tighten. Inhale deeply to activate the DV then breathe normally. POSITIVE PRESSURE Adjust the facemask top strap so...
• anti-static hoses flammable explosive atmospheres. Push the airline onto the Pro-Pak attachment connector. WARNING: Close cylinder valve while breathing from the airline. Give the supply airline a firm tug to ensure that it is securely connected. With cylinder valve still closed,...
PRO-PAK 5. DOFFING INSTRUCTIONS DOFFING THE APPARATUS WARNINGS: • DO NOT remove apparatus until well clear of the hazardous area. • If wearing a gas-tight chemical suit, remove until decontamination procedures are complete. • During extended Release the handwheel locking...
PRO-PAK Pump dispensers are available for the 6. AFTER USE above under Article Numbers 1017672 (1 Pro-Pak must be cleaned and tested as litre) and 1017670 (5 litres). detailed in the following instructions. TriGene disinfecting wipes available from Scott Health and Safety...
• Cylinder air pressure. explanatory label attached. STORAGE Check Pro-Pak in accordance with The apparatus must be stored in a clean, Section 3 - Pre-Use and Monthly Checks. dry environment away from direct heat and sunlight. Storage temperature should...
PRO-PAK 7. SCHEDULED ANNUALLY MAINTENANCE Pro-Pak must be returned for a workshop service annually major workshop service at six-yearly intervals. MONTHLY After each workshop service, perform the Test Pro-Pak in accordance with Section user checks detailed Section 3 - Pre-Use 3 - Pre-Use and Monthly Checks.