GE TBG16NACBRWW Use And Care & Installation Manual page 18

Top-mount no-frost refrigerator
Table of Contents

Advertisement

Available languages

Available languages

3
ROUTE THE COPPER TUBING BETWEEN THE
COLD WATER LINE AND THE REFRIGERATOR.
Route the tubing through a hole drilled in the
floor or wall (behind the refrigerator or adjacent
base cabinet) as close to the wall as possible. Be
sure there is sufficient extra tubing [about 8 feet
(244 cm) coiled into 3 turns of about 10² (25 cm)
diameter] to allow the refrigerator to move out
from the wall after installation.
4
CONNECT THE COPPER TUBING TO THE
SHUTOFF VALVE.
Place the compression
nut and ferrule
(sleeve) onto the
end of the tubing
and connect it to the
shutoff valve. Make
sure the tubing is fully
inserted into the valve.
Tighten the
compression nut
securely.
5
TURN ON THE WATER AND FLUSH OUT
THE TUBING.
a. Turn the main water supply on and flush out
the tubing until the water is clear.
b. Shut the water off at the water valve after
about one quart (1 l) of water has been flushed
through the tubing.
6
CONNECT THE COPPER TUBING TO
THE REFRIGERATOR.
Before making the connection to the
refrigerator, be sure the refrigerator power
cord is not plugged into the wall outlet.
We recommend installing a water filter (available
from your local distributor) if your water supply
has sand or particles that could clog the screen of
the refrigerator's water valve. Install it in the
water line near the refrigerator.
18
WATER LINE INSTALLATION
Compression nut
Saddle-type
shutoff
valve
Packing
nut
Outlet
Ferrule
valve
(sleeve)
(continued)
a. Remove the
plastic flexible
cap from the
water valve.
b. Place the
compression
nut and ferrule
(sleeve) onto the
end of the tubing
as shown.
c. Insert the
end of the copper
tubing into the water valve connection as far as
possible. While holding the tubing, tighten the
fitting.
d. Fasten the copper tubing into the clamp
provided to hold it in a vertical position. You may
need to pry open the clamp.
7
TURN THE WATER ON AT THE
SHUTOFF VALVE.
Tighten any connections that leak.
8
PLUG THE REFRIGERATOR POWER CORD
INTO A GROUNDED ELECTRICAL OUTLET.
9
SET THE ICEMAKER FEELER ARM TO THE ON
(DOWN) POSITION.
The icemaker will not begin to operate until it
reaches its operating temperature of 15°F (-9°C).
or below. It will then begin operation automatically
if the icemaker is in the ON (down) position.
NOTE: The icemaker may double-cycle when it
first starts, causing some water spillage from the
icemaker into the ice bucket. This is normal and
should not happen again. The first few batches of
cubes should be thrown away, so that remaining
impurities in the water line will be flushed out.
10
MOVE THE REFRIGERATOR BACK TO
THE WALL.
Arrange the coil of copper tubing so that it does
not vibrate against the back of the refrigerator or
against the wall.
Tubing
1/4² Copper tubing
clamp
Ferrule
(sleeve)
Compression nut
Refrigerator connection
1/4²

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents