Eaton-Williams Qualitair Technical Manual & Installation Procedures

Qpm chassis unit
Hide thumbs Also See for Qualitair:

Advertisement

E
a
t
o
n
-
W
i
l
l
i
a
m
s
L
t
d
E
a
t
o
n
-
W
i
l
l
i
a
m
s
L
t
d
TECHNICAL MANUAL &

INSTALLATION PROCEDURES

FOR
QPM CHASSIS UNIT
Eaton-Williams Ltd
Station Road – Edenbridge – Kent – TN8 6EG
Tel: +44 (0)1732 866066 Fax +44(0)1732 866653
:E\Manuals\Others\Qualitair\QPM\LG3298L/22QPMChassisUnit

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Qualitair and is the answer not in the manual?

Questions and answers

Summary of Contents for Eaton-Williams Qualitair

  • Page 1: Installation Procedures

    TECHNICAL MANUAL & INSTALLATION PROCEDURES QPM CHASSIS UNIT Eaton-Williams Ltd Station Road – Edenbridge – Kent – TN8 6EG Tel: +44 (0)1732 866066 Fax +44(0)1732 866653 :E\Manuals\Others\Qualitair\QPM\LG3298L/22QPMChassisUnit...
  • Page 2: Safety Procedures

    All works must be carried out in required. For noise levels guidance accordance with manufacturer’s refer to technical literature, or contact installation and operating procedures. Qualitair, their distributors advice. b) Good working practices must followed at all times so that Mechanical and Electrical Hazards are kept to a minimum.
  • Page 3: Site Requirements

    S Atkins Therefore it is important that the unit is level in all directions to prevent leaks. D Mortimer Qualitair The replacement chassis unit will be fitted with the following electrical connections to which suitable matching connections will have to be provided.
  • Page 4: Operating Procedure

    This will MAINTENANCE control your unit maintain temperature setting. Always allow the room conditions to stabilise before resetting the IMPORTANT controls. Before commencing any maintenance work, isolate the unit at mains supply. :E\Manuals\Others\Qualitair\QPM\LG3298L/22QPMChassisUnit...
  • Page 5 PM CHASSIS UNIT MANUAL :E\Manuals\Others\Qualitair\QPM\LG3298L/22QPMChassisUnit...
  • Page 6 If unit is fitted with auxiliary supply, NO Cleaning can be carried out by gently cooling functions are available during vacuuming both faces. operation on this supply. Condensate Drain Check condensate drain from evaporator fan assembly is clean and unblocked. Electrical Chassis Component Layout :E\Manuals\Others\Qualitair\QPM\LG3298L/22QPMChassisUnit...
  • Page 7: Performance Data

    Evaporator fan Deck Assembly LG3298L/01 ADDITIONAL DATA Condenser Fan Impellor LG3298L/02 3-pole C/O Relay LG3298L/08 Refrigerant 2-Pole C/P Relay LG3298L/09 Charge Weight 1.56kg Rocker Switch LG3298L/11 Filter Pad (Fresh Air LG3298L/12 Shipping Weight Control Thermostat LG3298L/07 (2 units on pallet) 124kg :E\Manuals\Others\Qualitair\QPM\LG3298L/22QPMChassisUnit...
  • Page 8 PM CHASSIS UNIT MANUAL :E\Manuals\Others\Qualitair\QPM\LG3298L/22QPMChassisUnit...
  • Page 9 PM CHASSIS UNIT MANUAL :E\Manuals\Others\Qualitair\QPM\LG3298L/22QPMChassisUnit...
  • Page 10 PM CHASSIS UNIT MANUAL PM CHASSIS UNIT MANUAL :E\Manuals\Others\Qualitair\QPM\LG3298L/22QPMChassisUnit :E\Manuals\Others\Qualitair\QPM\LG3298L/22QPMChassisUnit...

Table of Contents