ShelterKing 14 X 32 Assembly Instructions Manual

14 x 32 party tent style

Advertisement

Assembly Instructions ShelterKing Party Tent
Congratulations!
Congratulations on your purchase of a ShelterKing Party Tent Shelter by MDM Products LLC. With proper installation,
use, and maintenance, your new unit will provide many years of good and suitable service. Your new ShelterKing Party
Tent is a combination of excellent engineering and well thought out design.
The multiple part frame assembly is pre-drilled for easy insertion of hardware to assemble. The tubing is made from high-
grade steel tubing, to resist moisture and oxidation over the life of the shelter. The covering membrane is made from
ASTM-5 approved polyethylene materials. The cover is UV protected for continual exposure to the sunlight.
It is suggested that you read the entire assembly instructions completely before you begin. This will help attain the best
results for your installation.
The installation of this unit must conform to the requirements of all authorities having jurisdiction in your specific local
area. In the absence of such requirements, the assembly and installation must conform to the provided assembly and
installation instructions. MDM Products LLC will not be responsible for failure to comply with any requirements in a given
local area. Damages, consequential damages, or injuries caused by improper installation, alteration, improper use, or
damages caused by wind, rain or any acts of nature are strictly that of the user.
For installation assistance or Customer Service, please call 800-447-7079 or 203-380-2703, 8AM-5PM EST.
Cartons should be inspected upon delivery from carrier, and any evident damages should be noted on the bill of lading
before signing. If upon opening the cartons hidden damage is noted, contact carrier or its agent immediately. Claims for
shipping damage MUST be made with the shipping company. An inspection of the goods will most likely be required. Do
not discard packing or any components before the freight company's inspection. All claims for freight damage must be
made with 15 days of receipt of the goods in accordance with ICC regulations.
ASSEMBLY PROCEDURE
The proper sequence and steps to install this unit will produce a proper and good installation. Failure to read and follow
these guidelines may not result in a proper installation and will void all warranty and protection the owner is entitled to with
the product. The steps to be undertaken are:
1. Read Assembly Instructions completely before beginning installation.
2. Prepare location and place both unit boxes near location site
3. Perform an inventory check before beginning to be certain all components are available for installation.
4. Assemble plastic feet to upright corner and interior legs of unit.
5. Assemble Roof Frame with Poles and Connectors.
6. Install Main Roof Cover over Roof Frame assembly.
7. Add Corner and Upright Legs to Roof Frame Assembly – one side at a time.
8. Install Sidewall Panels and End Panels as desired.
9. Place Frame into desired position and secure to ground with guy ropes and stakes.
10. Anchor frame assembly to ground with provided straps through upright feet.
11. Complete securing tent to ground with corner guy ropes and feet stakes.
TOOLS REQUIRED
The following hand tools will be needed for proper installation of your new ShelterKing unit:
2lb Maul or Sledgehammer
Open End Adjustable Wrench or Sockets
V1.0 14 X 32 Size
Do NOT Return Unit to Store or Dealer. For all Questions or Shortages please call MDM Products LLC directly.
SAFETY WARNING
For Customer Service 800-447-7079 or 203-380-2703 8 AM – 5 PM EST
Assembly Instructions
14 X 32 Party Tent Style

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 14 X 32 and is the answer not in the manual?

Questions and answers

Summary of Contents for ShelterKing 14 X 32

  • Page 1 Congratulations on your purchase of a ShelterKing Party Tent Shelter by MDM Products LLC. With proper installation, use, and maintenance, your new unit will provide many years of good and suitable service. Your new ShelterKing Party Tent is a combination of excellent engineering and well thought out design.
  • Page 2 Assembly Instructions 14 X 32 Party Tent Style Shelter King 14’ x 32’ Party Tent Item# DIAGRAM DESCRIPTION Straight Uprights (Interior Leg Poles) - 78” Length (1980 mm) with two holes at one end Corner Uprights (Corner Leg Poles) – 78” Length (1980 mm) with additional holes for attaching Roof Cover Cross Poles - 77”...
  • Page 3 Assembly Instructions 14 X 32 Party Tent Style 4 way frame connectors with a sharp bend for the sides of the tent Protective Roof Cover – This unit is protected with UV protection. Should be carefully protected to avoid any tears or snags. Always dry completely before storing in storage bag.
  • Page 4: Site Preparation

    Select a level or as close to level as practical location for your ShelterKing Party Tent. The unit should be placed on Lay out all the parts as shown in the Frame Component a base for the intended use, usually grass or soft surface.
  • Page 5 Assembly Instructions 14 X 32 Party Tent Style Begin by assembling the Roof Frame. Start by connecting CARE AND SPECIAL PRECAUTIONS MUST BE TAKEN the Cross Poles (#3) together that will create the center IN ADVERSE OR WINDY WEATHER CONDITIONS.
  • Page 6 Assembly Instructions 14 X 32 Party Tent Style To attach the sidewall panels (#11), start at the top and at one of the panel and use the bungee cords (#13) in the same way as you did to secure the roof. Along the eaves it is best to share the same eyelets: i.e.
  • Page 7: Think Safety First

    Care and attention to a proper installation will add many or stormy weather. years of life and function to your ShelterKing Party Tent unit. FIRE WARNING A Fire Retardant treatment has been applied to the fabric of this tent that will significantly reduce the rate of flame spread, but the tent is still flammable.

This manual is also suitable for:

14 32

Table of Contents