Tate Premier SX User Manual page 16

Fire alarm control panel
Table of Contents

Advertisement

PREMIER SX USER MANUAL, MAINTENANCE GUIDE & LOG BOOK
This certificate confirms the installation and commissioning of a fire Alarm system at:
Protection area: _________________________________________________________________________________
Address:
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
In accordance with EN54: Part 1: 1998, sub clause 26.2, the installation has been inspected for compliance with the
recommendations of the code.
In accordance with EN54: Part 1: 1998, sub clause 26.3, the insulation of cables and wires has been tested.
In accordance with EN54: Part 1: 1998, sub clause 26.4, the earthing has been tested.
In accordance with EN54: Part 1: 1998, sub clause 26.5, the entire system has been tested for satisfactory operation.
In accordance with EN54: Part 1: 1998, sub clause 26.6, it is certified that the installation complies with the
recommendations of the code, other than the following deviations.
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
My attention has been drawn to the recommendations of EN54: Part 1: 1998 clause 29 relating to servicing the system. In
accordance with EN54: Part 1: 1998, sub clause 26.1, I confirm that record drawings and the user manual/log book have
been supplied and received by the following person (the recipient/user must complete their details here):
User's name: _____________________ User's Job Title: _____________________ Date: ____________________
For and on behalf of: ______________________________ User's Signature:* _______________________________
*you are advised to ensure the relevant sections of Pages 12 and 13 are complete before signing this Certificate
Signed (Commissioning Engineer: ________________________________________ Date: ____________________
For and on behalf of: _____________________________________________________________________________
The Installation/Commissioning Manual is situated at: ___________________________________________________
Approved Document No: GLT.MAN-102T
Issue: 1.1
Authorised: GH
&(57,),&$7(2),167$//$7,21
$1'&200,66,21,1*
Date: 06/11/02

PAGE 16

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Tate Premier SX

Table of Contents