5. Checking and maintenance

5
Checking and maintenance
5.1

General instructions

5.2

Periodic checks

19
MCR-P 24 MCR-P 24/28 MI MCR-P 30/35 MI MCR-P 34/39 MI
CAUTION
4
4
4
4
4
4
4
4 Check the water pressure in the installation. If the water pressure
is too low, add more water to the installation. ¼See chapter:
"Filling the system", page 20.
4 Carry out a visual check for the presence of any water leaks.
4 Open and close the radiator valves several times a year (this
prevents the valves from seizing up).
T000181-B
An annual inspection is compulsory.
We recommend taking out a maintenance contract.
Maintenance operations must be done by a qualified
engineer.
Only original spare parts must be used.
Make certain that the flues and chimneys are
connected, in good condition and not blocked.
Do not modify nor block the condensate outlet(s).
If a neutralisation system is installed, follow the
instructions delivered with the neutralisation system
for cleaning and servicing of this system.
070513 - 127684-01