Initial Operation - Kelvinator KGC20BNA User Manual

Gas continuous flow hot water system
Hide thumbs Also See for KGC20BNA:
Table of Contents

Advertisement

Initial operation

caution
The following process should be completed by the
installer only
Once all checks have been completed, please clean filter of
any debris. Refer to page 10 for instructions.
1. Fully open the manual water control valve on the water
supply line.
2. Open a hot water tap to verify that water is flowing to
that tap then turn the tap off.
3. Fully open the manual gas control valve installed.
4. Turn on the 240 volt 50 Hz power supply to the
water heater.
5. Now you are ready to enjoy hours of endless hot water.
Kelvinator gas continuous flow hot water systems operation 7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents