Daewoo TVZ 1321 Service Manual page 15

Tv/vcr in one board, chassis : cn-140 ntsc-m system
Table of Contents

Advertisement

Fig. 16- Loading Lever Ass'y Disassembly
NOTE :
Reassemble the cassette loading mechanism using the
reverse procedures. Confirm that the two (2) bosses on the
left side of the cassette holder are inserted into the groove
in the left side of the top plate. Insert the two (2) bosses on
the right side into the F/L bracket R (Fig. 17)
Fig. 17- F/L Brkt R
Replacement of the Drum Assembly/Earth
Bracket
(fig. 18)
1. Remove three (3) screw (3).
2. Remove the earth bracket (5).
3. Carefully lift drum assembly (4) from the deck mecha-
nism taking care not to damage or touch the video
heads.
NOTE :
After reassembling the assembly, confirm that the tape runs
smoothly and confirm all tape path adjustment procedures
in the "Mechanical Adjustment" section of this service publi-
cation.
Fig. 18- Replacement of the Drum total Ass'y and Earth Brkt Ass'y
Reel belt, Loading Rack, Loading Gears, and
S/T Slant Pole Removal
1. Turn the Deck Mechanism upside down and remove the
reel belt.
2. Remove one (1) poly washer ¤ and remove the loading
rack (2).
3. Remove Right and left loading gears ¤Øand ¤Œ .
4. Remove the S and T slant poles ¤º and ¤ by pulling
them in the direction of the arrow.
NOTE :
• Take care not to get grease on the guide rollers.
• When reinstalling, realign the gears as shown in Fig 20.
Fig. 19- Reel belt, Loading Rack, Loading Gears, S/T slant pole
Removal
13
(Fig. 19, 20)

Advertisement

Table of Contents
loading

Table of Contents