3-6. OP SERVICE ASSY
3 precision pan screw
(M1.4)
4 rack spring (s)
3-7. HOLDER ASSY
1 Open the holder assy.
1 washer (0.8 - 2.5)
5 precision pan screw (M1.4)
2 gear (SA)
6 thrust detent spring
8 Pull off the lead screw.
B
over write head section
3 Remove the holder assy to
direction of the arrow B .
A
7
9 Opening the over write head
toward the direction A , remove the
OP service assy toward
the direction B .
Note: Do not open the entire assy
forcibly, when opening
the over write head.
A
2
B
boss
MZ-G755
9