7.2.
When Replacing the Main P.C.B.
After replacing the MAIN P.C.B., it is necessary to use the "DIAS" software to allow the release of adjustment flag(s).
The Adjustment software "DIAS" is available at "TSN Website". To download, click on "Support Information
from NWBG/VDBG-AVC".
*DIAS (DSC Integrated Assist Software)
7.3.
Service Position
This Service Position is used for checking and replacing parts. Use the following Extension cables for servicing.
No.
Parts No.
1
VFK1906
2
VFK1953
CAUTION-1. (When servicing FLASH P.C.B.)
1. Be sure to discharge the capacitor on FLASH P.C.B..
Refer to "HOW TO DISCHARGE THE CAPACITOR ON FLASH P.C.B.".
The capacitor voltage is not lowered soon even if the AC Cord is unplugged or the battery is removed.
2. Be careful of the high voltage circuit on FLASH P.C.B..
3. DO NOT allow other parts to touch the high voltage circuit on FLASH P.C.B..
Table S1 Extension Cable List
Connection
PS9001 (MAIN) - PP8001 (FLASH)
FP9005 (MAIN) - LENS UNIT
24
Form
20PIN B to B
40PIN 0.5 FFC