Download Print this page

Glastender BPIK Installation Instructions Manual

Beer pump panel

Advertisement

Quick Links

BPIK, Beer Pump Panel
Page 2
BPIK-Y, Beer Pump Panel with Y Angle Bracket
Page 4
BIK, Beer Panel
Page 6
BIK-Y, Beer Panel with Y Angle Bracket
page 8
Rev. 04-06-06
B
P
EER
ANELS
I
NSTALLATION
Glastender, Inc. · North Michigan Road · Saginaw, MI · 48604-9780
800.748.0423 · 989.752.4275 · Fax 800.838.0888 / 989.752.4444 · www.glastender.com
BPIK-E, Beer Pump Panel with Empty Keg Detector
Page 3
BPIK-EY, Beer Pump Panel with Empty Keg Detector
& Y Angle Bracket
Page 5
BIK-E, Beer Panel with Empty Keg Detector
Page 7
BIK-EY, Beer Panel with Empty Keg Detector &
Y Angle Bracket
Page 9
Page 1 of 9
I
NSTRUCTIONS
© 2006 Glastender, Inc.

Advertisement

loading
Need help?

Need help?

Do you have a question about the BPIK and is the answer not in the manual?

Questions and answers

Summary of Contents for Glastender BPIK

  • Page 1 ANELS NSTALLATION NSTRUCTIONS Glastender, Inc. · North Michigan Road · Saginaw, MI · 48604-9780 800.748.0423 · 989.752.4275 · Fax 800.838.0888 / 989.752.4444 · www.glastender.com BPIK-E, Beer Pump Panel with Empty Keg Detector BPIK, Beer Pump Panel Page 3 Page 2...
  • Page 2 10 pounds and work up from there to achieve a 2 ounces per second flow rate. NOTE: If supplied, empty keg detectors (FOB stops) should be mounted after the beer pump. Glastender, Inc. 5400 North Michigan Road Saginaw, MI. 48604-9780 800.748.0423 989.752.4275 Fax: 989.752.4444 www.glastender.com...
  • Page 3 Upon start-up, the beer pump regulator should be set at a pressure level that provides the proper flow rate. Start around 10 pounds and work up from there to achieve a 2 ounces per second flow rate. Glastender, Inc. 5400 North Michigan Road Saginaw, MI. 48604-9780 800.748.0423 989.752.4275 Fax: 989.752.4444 www.glastender.com...
  • Page 4 BPIK-Y Beer Pump Panel Installation Instructions Glastender, Inc. 5400 North Michigan Road Saginaw, MI. 48604-9780 800.748.0423 989.752.4275 Fax: 989.752.4444 www.glastender.com F-750-358 Rev. A...
  • Page 5: Installation Instructions

    Upon start-up, the beer pump regulator should be set at a pressure level that provides the proper flow rate. Start around 10 pounds and work up from there to achieve a 2 ounces per second flow rate. Glastender, Inc. 5400 North Michigan Road Saginaw, MI. 48604-9780 800.748.0423 989.752.4275 Fax: 989.752.4444 www.glastender.com F-750-359 Rev.
  • Page 6 The goal is to achieve a flow rate of 2 ounces per second. Glastender, Inc. 5400 North Michigan Road Saginaw, MI. 48604-9780 800.748.0423 989.752.4275 Fax: 989.752.4444 www.glastender.com...
  • Page 7 The goal is to achieve a flow rate of 2 ounces per second. Glastender, Inc. 5400 North Michigan Road Saginaw, MI. 48604-9780 800.748.0423 989.752.4275 Fax: 989.752.4444 www.glastender.com...
  • Page 8 2 ounces per second. If you do not have an even flow rate out of each of the two faucets and are not certain of how to balance the system, consult the factory. Glastender, Inc. 5400 North Michigan Road Saginaw, MI. 48604-9780 800.748.0423 989.752.4275 Fax: 989.752.4444 www.glastender.com F-750-362 Rev.
  • Page 9 If you do not have even flow rate out of each of the two faucets and are not certain of how to balance the system, consult the factory. Glastender, Inc. 5400 North Michigan Road Saginaw, MI. 48604-9780 800.748.0423 989.752.4275 Fax: 989.752.4444 www.glastender.com...

This manual is also suitable for:

Bpik-eBpik-yBpik-eyBikBik-eBik-y ... Show all