OPERATION MANUAL

Complete Instructions for Installation and Operation
MaxPower Corporation
230 Yuma Street
M
H
R
S
ove it.
ang it.
ack it.
tack it.
Denver, CO 80223
800-576-3966
www.coolcube10.com
05/05
P/N: 5-TC600-2510

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CoolCube 10 and is the answer not in the manual?

Questions and answers

Summary of Contents for MaxPower Corporation CoolCube 10

  • Page 1: Operation Manual

    OPERATION MANUAL Complete Instructions for Installation and Operation MaxPower Corporation 230 Yuma Street ove it. ang it. ack it. tack it. Denver, CO 80223 800-576-3966 www.coolcube10.com 05/05 P/N: 5-TC600-2510...
  • Page 2: Table Of Contents

    0.6 kW Refrigerant Type R-22 Refrigerant Charge 15.5 oz. Congratulations on purchasing the CoolCube 10 air conditioner. This manual explains Safety Devices how to install and operate the Cool Cube air conditioner. If you have any questions, Compressor Overload Protector Included...
  • Page 3: Features

    The CoolCube 10 base module is used in conjunction with various accessories to adapt to your environmental needs. These accessories (i.e. Nozzle Kit, Portable Package, Rack Package, Hanging Package, etc) are sold separately to allow you to customize the CoolCube 10 module to your specific needs. Please contact your CoolCube reseller for information and availability.
  • Page 4: Application

    Applications REMOTE CONTROL REMOTE CONTROL The CoolCube 10 comes standard with a remote control. The remote control operates all the The CoolCube 10 comes standard with a remote control. The remote control operates all the Choosing the Application features that are standard on the CoolCube’s control pad. To operate the CoolCube with the remote features that are standard on the CoolCube’s control pad.
  • Page 5: Installation

    • Do not tip the CoolCube 10 on its side. If the CoolCube 10 has been on its side, stand it upright and wait at least 2 hours before starting up the air conditioner. Failure to have the CoolCube 10 upright...
  • Page 6: Portable

    See Figure 1 & 2 second hour, the SET POINT temperature will remain stable. • Attach the Handles to the top panel of the CoolCube 10 unit. See Figure 1 & 2 (Optional) • Fan Mode Control Dip Switch •...
  • Page 7 Attach the Portable Accessories (casters/feet) to the base panel of the CoolCube 10 unit. See Figure 1 & 2 • Attach the Handles to the top panel of the CoolCube 10 unit. See Figure 1 & 2 (Optional) AUTO •...
  • Page 8: Hanging - Permanently Connected

    Stacking the CoolCube Units (See Detailed Accessories’ Instructions) As the environment dictates, the CoolCube 10 unit may be hung above the floor in an industrial setting or in a drop ceiling in an office setting. The CoolCube 10 can be hung from a building’s structural •...
  • Page 9 Two or three CoolCube 10 units are required when redundancy is critical, cooling large areas, or high Hanging the CoolCube 10 (See Detailed Accessory Instructions/Applicable Building Codes) heat loads. The CoolCube 10 units can be stacked on top of each other to produce a capacity of 20,000 •...
  • Page 10: Rack-Mount

    Rack-Mount Applications Rack-Mount Applications The CoolCube 10 unit is ideal for cooling small computer rooms and server closets. The CoolCube 10 can easily be installed inside a standard 19-Inch computer rack. To facilitate the installation of the CoolCube 10 unit inside the rack, a 19-Inch Rack Kit accessory is required. Additionally, there are...