Ceiling Tile Installation; Step 1 - Cut The Hole; Step 2 - Install C-Ring And Tile Rails - Electro-Voice EVID C12.2 User Manual

Hide thumbs Also See for EVID C12.2:
Table of Contents

Advertisement

Ceiling Tile Installation

Step 1: Cut the Hole (Figure 5)
Cut out the hole by tracing the cardboard template or with a circular cutter set to the
appropriate cutout size. If the wire has been pre-installed, pull the wiring through the cutout
hole.
Step 2: Install C-Ring and Tile Rails (Figure 6)
For suspended ceiling installations, insert the C-ring through the hole cut in the ceiling tile.
Place the C-ring around the hole with the tabs located as shown in Figure 6. Insert the tile
rails through the cut hole in the ceiling tile. Snap the two rails into the two tabs in the C-ring
and align the rails so that the ends extend OVER the T-channel grid on the side of the tile.
Secure the rails onto the C-ring tabs by inserting a screw though each tab into the rail, as
shown in Figure 6.
4
Figure 5: Cut Ceiling Hole
Figure 6: Secure Rails to C-Ring
EVID
TM
C12.2 Ceiling Speaker Installation and Operations Manual

Advertisement

Table of Contents
loading

Table of Contents