Checking And Testing Operation - Williamson-Thermoflo 9SRA-HE Installation & Service Manual

Wall-mounted split air conditioner r-410a
Hide thumbs Also See for 9SRA-HE:
Table of Contents

Advertisement

CHECKING AND TESTING OPERATIONS
Perform the operation test after completing the gas leak check of the flare nut connections and the electrical connections.
1. To begin the test, turn on the power.
2. Press the auxiliary control button in the indoor unit or use the remote control to start the unit.
3. Check that all air conditioner functions are operating normally. A protection feature prevents the air conditioner from
being started immediately after the unit has been turned off. There is a delay of 3 minutes for the air conditioner to restart
and operate.
4. Press the auxiliary control button to end the operation test.
9 000-12 000 BTU
Installation & service manual _15
Auxiliary control button
15 000-18 000-24 000 BTU
Auxiliary control button

Advertisement

Table of Contents
loading

Related Products for Williamson-Thermoflo 9SRA-HE

This manual is also suitable for:

12sra-he15sra-he18sra-he24sra-he

Table of Contents