Cycle - LG LBNS3061BL Service Manual

Ceiling duct conditioner exploded view
Hide thumbs Also See for LBNS3061BL:
Table of Contents

Advertisement

Cycle

1. Installation (Connecting the piping between indoor and outdoor unit)
Indoor unit
Gas cylinder
R22
Purge the air
* ABNH366KSB0/ABUH366KSB0 : R-410A
• Installation
(1) Connect the piping between the indoor and
outdoor unit firmly.
– Incorrect connection may cause the leakage and
incomplete vacuuming.
(2) Attach the charging hose (manifold gage) to the
service port.
– Charging hose is necessary to check the pressure
and to inject R22 for leakage test.
– The valve of charging hose must be closed before
being connected.
(3) Inject the 100~300g R22 through the charging hose
opening the valve.
(4) Check the joint part using a gas detector or soapy
water for leakage.
– On checking, the service valve of main service port
must be closed, this test is only for checking whether
pipe connection is ok or not.
Copyright ©2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
Liquid side
Gas side
Lo
(5) If there is no leakage, discharge R22 in piping
(6) After closing the valve of charging hose,
(7) Turn on the vacuum pump until the pressure drops
(8) After vacuuming, disconnect the vacuum pump and
(9) Open the liquid side completely first and then the
- 43 -
Outdoor unit
completely into tank for retrieving.
– Complete discharge is needed for vacuuming.
– If leakage is found, please fasten the joint more
tightly.
disconnect the tank and connect the vacuum pump
to charging hose and open the valve again for
vacuuming.
below 0kg/cm
.
2
open the spindle of service port (liquid-side)
slightly for 30 sec and then open the spindle of
(gas side) with hexagonal wrench.
gas side fully in order.
LGE Internal Use Only

Advertisement

Table of Contents
loading

Table of Contents