Progressive PD5100 Installation And Operation Manual

Pd5100 automatic transfer switch

Advertisement

Installation and Operation Guide for PD5100
Automatic Transfer Switch
Member
P r o g r e s s i v e D y n a m i c s, I n c .
507 Industrial Rd
Marshall, MI 49068
www.progressivedyn.com
110538 Rev A
© 2012 Progressive Dynamics, Inc.
All rights reserved.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PD5100 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Progressive PD5100

  • Page 1 Installation and Operation Guide for PD5100 Automatic Transfer Switch Member P r o g r e s s i v e D y n a m i c s, I n c . 507 Industrial Rd Marshall, MI 49068 www.progressivedyn.com 110538 Rev A ©...
  • Page 2 Upon determination that a warranty claim exists (a defect in material or workmanship occurring under normal use and service,) the product shall be shipped postage prepaid to Progressive Dynamics, Inc. together with proof of purchase. The product will be repaired or replaced and returned postage prepaid.
  • Page 3: Installation Instructions

    Page 1  WARNING: TORQUE ALL CONNECTIONS PER LABEL – EXCESSIVE TORQUE MAY CAUSE DAMAGE TO CONNECTIONS LEADING TO A FIRE CAUSING PROPERTY DAMAGE, SERIOUS INJURY OR DEATH. WARNING: SHOCK HAZARD - DUE TO THE HIGH VOLTAGES ASSOCIATED WITH ITS OPERATION ONLY QUALIFIED SERVICE PERSONNEL SHOULD INSTALL OR TROUBLESHOOT THIS TRANSFER SWITCH! ALL APPLICABLE CODES AND STANDARDS MUST BE MET WHEN INSTALLING THIS DEVICE.
  • Page 4 Page 2 PD5100 TROUBLESHOOTING GUIDE The Automatic Transfer Switch (ATS) is designed to be quickly tested for proper operation and repair if necessary. All critical circuits are located on the easily replaceable circuit board. The following will describe how to test for proper circuit board op- eration and how to replace it if necessary.
  • Page 5: Wiring Diagrams

    Page 3 2. Pull the circuit board out of the plastic housing and then using a screwdriver blade, pry the Yellow, White, Black and Red wires off the connectors on the circuit board. 3. Replace the Circuit Board and reconnect the four (4) wires and test the system by starting the Generator. The Relay should energize in 20-45 seconds.
  • Page 6 P r o g r e s s i v e D y n a m i c s, I n c . 507 Industrial Rd Marshall, MI 49068 Visit us on the web for other great products. www.progressivedyn.com...

Table of Contents