Summary of Contents for White-Westinghouse SWS833HQ1
Page 1
Installation Instructions [::_ii_i,,_!!_ [_:ii !i_ _i_!!i!!iii_i__:iil_211_i!!!i_!!!,_ ,_ ,fi!_iiii!_ _ii_i:,_!_"ii!!!i:,C_iCi!ii _ ;ii_',,i_i_iiii_ _ii_!:i'i_i!_,_i_iiiiill _!_i_,i_!iii_ii,_i_!_i!ii!_,:!_i _i:_,_i_ii_:_?,:_!i!!ii!?,_i ..instrucciones para la instaladOn Before beginning installation, carefully read these instructions. This will simplify the installation and ensure the washer is installed correctly and safely. Leave these instructions near the washer...
Page 2
DRAIN REQUIREMENTS PRE-INSTALLATION REQUIREMENTS Drain capable of eliminating 17 gallons (64.3 L) per minute. Tools Required for Installation: A standpipe diameter of 1-1/4 in. (3.18 cm) minimum. 3/8 in. socket wkh ratchet. The standpipe height above the floor should be: Channel-lock adjustable pliers.
Page 3
NOTE: If the washer is to be transported at a later date, the tub blocking pad, shipping bolt, and plastic spacer block should be retained. PLASTIC SHIPPING BLOCKS ..SPACER BLOCK CABLE TIE MECHANISM SHIPPING BOLT FOAM / CABLE TIE SHIPPING >OWER CORD...
Page 4
REQUISITOS ANTES DE LA INSTALACION 4. La tubena de agua fria con conexi0n a tierra DEBE tenet continudad metalica hacia la conexi0nelecticia Herramientas necesarias para la instaladon: a tierra y DEBE registrar una resistencia no mayor de Llava de tubo de 3/8 de pulgada. 25 ohmios.
Page 5
BLOQUE DE DIMENSIONES PARA LA INSTALACION BLOQUE EMBARQUE .. ESPACIADOR DE PLASTICO PERNO DE EMBARQUE (ATRAS) SALIDA 11 7/16" I11,"6 ESPUMA AL DREN 29 7,1_¢' 29.05 _,UDA (ATRAS) (74.77 em PROTECTORA :ORDON _334" DE EMBARQUE ELECTRICO 9.._3 cm) ESQUINERAS DE MANGUERA EMBARQUE DE LA_ CAJA DE CARTON...
Page 6
NOTA: el diametro interno de la tuberia vertical 4. Determine cu_fllde las Ilaves de agua CALIENTEy conecte con cuidado el tubo inferior de entrada a la debe ser de 1-1/4 pulgadas (3,18cm) Ilave de agua CALIENTE, apriete a mano y luego apriete como minimo.