When installing the PB105 in a mobile home several
requirements must be followed:
1. The unit must be bolted to the floor.
2. The unit must be connected to outside air.
3. Floor protection and clearances must be followed.
4. Unit must be grounded to the metal frame of the mobile
home.
8
Assembly
INSTALLATION IS TO BE PERFORMED BY A
QUALIFIED INSTALLER.
NOTE: All installation clearances and restrictions
must be adhered to.
NOTE:Use only 4" diameter type "L" or "PL" venting
system. Be sure to inspect and clean exhaust venting
system frequently.