AMW 67710E Installation, Operation & Service Manual

American metal ware coffee urn

Advertisement

American Metal Ware
Installation, Operation & Service Manual

TABLE OF CONTENTS

Warning Labels.......................................2
Introduction.............................................3
About the 67710E Coffee Urn..................4
General Description.....................4
Features of This Model................4
Pre-Installation........................................5
Package Contents.......................5
Rough In Drawing....................................6
Installation...............................................7
Initial Considerations...................7
Complete the Hook Up................8
Initial Start Up..............................9
Operation..............................................10
Load the Coffee.........................10
Start the Brew............................10
Adjustments..........................................12
Bypass Adjustment....................12
Thermostat Adjustment..............12
Timer Adjustment.......................13
Flow Rate Adjustment................13
Fill Rate Adjustment...................14
Cleaning................................................15
After Each Use...........................15
Each Day...................................15
Semi-Weekly..............................15
Wiring Diagram......................................16
© Grindmaster Corporation™, 1996
PRINTED IN USA
For
Model 67710E
X
Electric
Special Features
After completing installation and set-up, the
equipment owner should keep this manual for
Coffee Urn
®
future reference.
Grindmaster Corporation™
4003 Collins Lane
Louisville, Kentucky 40245 USA
(502) 425-4776
(800) 695-4500
(USA and Canada only)
(800) 568-5715
(technical service only)
FAX: (502) 425-4664
www.grindmaster.com
Steam
1104 Form # AM-320-02

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 67710E and is the answer not in the manual?

Questions and answers

Summary of Contents for AMW 67710E

  • Page 1: Table Of Contents

    American Metal Ware Installation, Operation & Service Manual TABLE OF CONTENTS Warning Labels...2 Introduction...3 About the 67710E Coffee Urn...4 General Description...4 Features of This Model...4 Pre-Installation...5 Package Contents...5 Rough In Drawing...6 Installation...7 Initial Considerations...7 Complete the Hook Up...8 Initial Start Up...9 Operation...10...
  • Page 2: Warning Labels

    American Metal Ware 67710E Coffee Urn Page 2...
  • Page 3: Introduction

    Adjustment section of this manual. This section will explain the safest and easiest procedures for finding and making adjustments. A repair parts section will help you identify the parts you need. Page 3 American Metal Ware 67710E Coffee Urn...
  • Page 4: About The 67710E Coffee Urn

    • High Speed Brewing - Brew in both liners simultaneously. Maintenance • All components are easily accessible in the side control enclosure. • Replace most components without draining the urn. • Durable, easy to clean, 304 stainless steel construction. American Metal Ware 67710E Coffee Urn Page 4...
  • Page 5: Pre-Installation

    The next page shows a rough-in drawing, number 094-004. Refer to this drawing for information required for installation. The drawing shows the locations of the electric and water inlets, and some important dimensions of the brewer. Page 5 American Metal Ware 67710E Coffee Urn...
  • Page 6 American Metal Ware 67710E Coffee Urn Page 6...
  • Page 7: Rough In Drawing

    The height of the feet is adjustable for this purpose. Complete the Hook Up Water Hook-Up The water connection is on the back of the urn’s control enclosure - see figure 1. Page 7 Remove the control enclosure to expose electric American Metal Ware 67710E Coffee Urn...
  • Page 8 Wire the cord to the terminal block and the ground connection shown in figure 2. Be sure the connection is secure and no strands touch adjacent wires. American Metal Ware 67710E Coffee Urn Electric Inlet 3/8” FPT Water Inlet...
  • Page 9: Initial Start Up

    If cold water is used, the heat-up time is approximately 30 minutes depending on the electric ratings of the urn. An indicator light labeled WATER HOT will turn on when the heaters have shut off. Page 9 American Metal Ware 67710E Coffee Urn...
  • Page 10: Operation

    Be certain to close the cover over • the liner you wish to use. Press the START switch for the • liner you are brewing to. American Metal Ware 67710E Coffee Urn WATER HOT FILLING COFFEE IN LINER BREW LOCK BREW LIGHT...
  • Page 11: After The Brew Is Finished

    Replace the basket on top of the liner and close the lid. The lid may be locked again. • Monitor the level of coffee by checking the flashing light labeled COFFEE IN LINER WHEN LIT. If this light is flashing, the liner is almost empty. Page 11 American Metal Ware 67710E Coffee Urn...
  • Page 12: Adjustments

    Turn off power to the urn. • Remove the control enclosure access cover. • Locate the thermostat shaft inside the control enclosure. • Turn the shaft full on. American Metal Ware 67710E Coffee Urn Figure 4, Bypass Valve Adjustment Screw Figure 5, Thermostat Page 12...
  • Page 13: Timer Adjustment

    Brew water into the liner for the standard 12 1/2 minutes. Adjust the timer if it does not run the pump for the correct time. Page 13 Timer Adjust Figure 6, Brew Timer Spray Over Rate Control Figure 7, Flow Valve American Metal Ware 67710E Coffee Urn...
  • Page 14: Fill Rate Adjustment

    If the light cycles on and off, the rate is fast enough. If the FILLING light stays on, the rate is too slow. Re-adjust. • American Metal Ware 67710E Coffee Urn Figure 8, Fill Rate Valve Watch the Page 14...
  • Page 15: Cleaning

    Brush inside of the faucet body. Clean the silicone faucet seal. • Also, with the liners empty, remove the coffee faucets from their shanks. Brush clean the tube interior which leads to the center of the liners. Page 15 American Metal Ware 67710E Coffee Urn...
  • Page 16: Wiring Diagram

    American Metal Ware 67710E Coffee Urn Page 16...
  • Page 17 Page 17 American Metal Ware 67710E Coffee Urn...
  • Page 18 Notes American Metal Ware 67710E Page 18...
  • Page 19 Grindmaster® Coffee Grinders and Brewers • Espressimo® Espresso Machines • Crathco® Hot Beverage Dispensers Crathco® Cold and Frozen Beverage Dispensers • American MetalWare® Coffee and Tea Systems Tel (502) 425-4776 • Fax (502) 425-4664 • 1-800-695-4500 P.O. Box 35020 • Louisville, KY 40232 • USA...

Table of Contents

Save PDF