Steps to install an RRL/OCI in a Fire Smoke Damper:

1) Drill/saw a 3 5/8 in. (92mm) diameter hole in sleeve
(Detail 2).
2) Attach indicator bracket to blade. For an airfoil
blade dampers, use existing holes in blade (Detail
1-A). For a 3V blade damper, drill two 0.166
in. (4mm) holes (Detail 1-B). Fasten bracket to
bladewith #10 x 1/2 in. (13mm) TEK screws (or
equilavent).
3) Fit indicator link into blade bracket (Detail 1-C).
4) Insert RRL/OCI unit through hoel in sleeve (round
end inside).
Detail 1
Upturned Leg Faces
Away Fr o m Blade End
#10 x 1/2 in. T ek Screw
or Equivelant
Part No. 415555
2 Req'd
A
Airfoil Blade
Indicator
Link
C
Note: Indicator Link Part Nos
For Standard Sleeve (short): 457808
For Extended Sleeve (long): 457801
Indicator Bracket
Part No. 658594
1 Req'd
Upturned Leg
Faces Away From
Blade End
#10 x 1/2 in. Tek
or Equivelant
Part No. 415555
2 Req'd
B
0.166 in. dia.
2 Places
Indicator
Bracket
.
for RRL/OCI
on FSD, SEFSD, SSFSD series
for RRL/OCI field kit (part numbers
5) Place 4 in. x 4 in. J-box over the flange of the
RRL/OCI unit and align holes.
6) Mount control box to sleeve/sideplate with
#10-16 x 3/4 in. (19mm) TEK screw or equilavent
(Detail 1-D).
7) Place one pushnut on the switch wire. Place
indicator link on switch wire and secure with a
second pushnut (Detail 1-D).
8) Complete wiring and install J-box cover.

RRL/OCI - Exploded View

Screw
Indicator Bracket
Part No. 658594
1 Req' d
1.750
3-V Blade
Part Number 471836

Installation Instructions

(Resettable/Reusable
Link with Open/Close Indicator)
852291 & 822468)
D
Gasket
1 Req'd
Push Nuts
2 Req'd
Indicator Link
(short or long; see C)
1 Req'd
#10-16 x 3/4 in .
SIHWH Screw
2 Req'd
J-Box Cover
1 Req'd
J-Box
1 Req'd
RRL/OCI
1 Req'd

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SEFSD Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Greenheck SEFSD Series

  • Page 1: Installation Instructions

    Steps to install an RRL/OCI in a Fire Smoke Damper: 1) Drill/saw a 3 5/8 in. (92mm) diameter hole in sleeve (Detail 2). 2) Attach indicator bracket to blade. For an airfoil blade dampers, use existing holes in blade (Detail 1-A).
  • Page 2: Wiring Diagram

    Electrical Capacity = 10 AMP (max) Optional Momentary Contact Test Switch Black Black By Others Yellow Yellow Yellow Yellow Copyright © 2008 Greenheck Fan Corporation RRL/OCI Rev 1 July 2008 White Electric Damper Actuator or Pneu. Solenoid Valve Damper Indicator LIghts...