Download Print this page

GE Profile Advantium PSB2200NBB Dimension Manual page 2

240 wall oven
Hide thumbs Also See for Profile Advantium PSB2200NBB:

Advertisement

PSB2200N
PSB2200N
GE Profile Advantium
GE Profile Advantium
Preparation WItH an Accessory Drawer
Prepare the opening
The Advantium 240V can be installed in combination with
other GE/Monogram appliances. Always follow each product's
Installation Instructions to compete the installation.
Single Advantium 240V Installation:
Order a 30" wide single oven cabinet or cut the opening in a wall
to the dimensions shown.
* For existing cutouts, a
maximum width of 28-1/2"
is acceptable. If the opening
is slightly wider, secure a
furring strip on each side of
the cutout for securing the
oven.
• Always maintain 36-3/4"
minimum height from
the floor to the cutout in
from floor
any single or combined
installation.
• Allow 3/4" to 2-1/8" case
trim overlap on the sides
and 7/8" overlap on the
bottom of the opening for
all models. The amount of overlap on the sides depends on the
actual cutout width. Allow 1-1/4" case trim overlap on the top for
models PSB2200 and PSB2201 and for models ZSC2200, ZSC2201
and ZSC2202.
• Oven overlaps will conceal cut edges on all sides of the opening.
For answers to your Monogram,
GE Profile
®
GE
®
appliance questions, visit our website at
ge.com or call GE Answer Center
®
800.626.2000.
240 Wall Oven
240 Wall Oven
®
®
23-1/2"
30"
25-1/4"
Min.
21"
Construct
Base
Min. 3/8"
Plywood
5" min.
Supported
by 2x4 or 2x2
1" min.
Runners all
above
Four Sides
toekick
or
service,
Prepare the opening (cont.)
When installed over a single oven or a
warming drawer, allow at least 2" between
the two openings. This separation will
provide clearance for bottom overlap of the
Advantium 240V and the other appliance
overlaps.
Construct a solid oven floor of 3/8" min. thick
plywood supported by 2 x 4 or 2 x 2 runners
on all sides.
• the support must be level and rigidly
mounted, flush with the bottom edge of
the cutout.
Installation over a GE/Monogram
Warming Drawer:
23-1/2"
Construct
30"
Solid Bottom
Min. 3/8"
Plywood
Supported
25-1/4"
by 2x4 or 2x2
Min.
Runners all
Four Sides
2" Min.
21"
(3" recommended)
Per warming
drawer
requirement
5" min.
from floor
1" min.
above
toekick
* For existing cutouts, a maximum width of
28-1/2" is acceptable. If the opening is slightly
wider, secure a furring strip on each side of
the cutout for securing the oven.
Note: Additional clearances between the
cutouts may be required. Check to be sure the
oven supports above the Warming Drawer
location do not obstruct the required interior
depth and height. See Warming Drawer
installation instructions for details.
Installation over a GE/Monogram Oven
and Warming Drawer:
Warming Drawer:
Construct Solid
Bottom Min.
30"
23-1/2"
3/8" Plywood
Supported by
2x4 or 2x2
Runners all
25-1/4"
Four Sides
Min.
21"
2" Min.
(3" recommended)
Per Oven
Requirement
5" min.
from floor
2" Min.
1" min.
above
Per warming drawer requirement
toekick
* For existing cutouts, a maximum width of
28-1/2" is acceptable. If the opening is slightly
wider, secure a furring strip on each side of
the cutout for securing the oven.
Note: Additional clearances between the
cutouts may be required. Check to be sure the
oven supports above the Warming Drawer
location do not obstruct the required interior
depth and height. See Warming Drawer
installation instructions for details.
CAutION: For personal safety, the mounting
surface must be capable of supporting the
cabinet load, in addition to the added weight
of this approximate 80-pound oven and 30-
pound drawer, plus additional oven loads of up
to 50 pounds or a total weight of 160 pounds.
Specification Created 9/08
Listed by
Underwriters
Laboratories
240442

Advertisement

loading