GE ASF24 Owner's Manual And Installation Instructions page 13

General electric owner's manual and installation instructions air conditioners ash18, asw18, asf24, asl24, asm24, asn24, asq24, asv24, asw24
Table of Contents

Advertisement

Available languages

Available languages

Window Installation Instructions
6
INSTALL THE CASE
IN THE WINDOW
Cut the window sash seal to the window
A
width and stick the adhesive side to the
bottom of the sash.
Window sash seal
B
Thread two type C bolts into the support
brackets.
Slide the case into the window and lower
the window behind the top mounting rail.
Position the brackets on the case bottom so
they will be near the outermost point on the
window sill. Attach the support brackets to
each side of the case bottom using 4 type A
screws on each side. The case should be
slightly tilted to the outside. Use a level;
about a 1/2 bubble will be the correct case
slant to the outside.
C
Locate the 8 screw holes along the bottom
front edge of the case. Center the case, side-
to-side, in the window and mount it to the
window sill using 5 type B screws staggered
in the front and back rows if possible.
Top mounting rail
Type B
screws
Type B screws
Extend the left and right accordion panels to
D
the vertical window sashes and attach with
4 type B screws.
Type A screws
Type C bolts
Type B
screws
13
7
INSTALL THE SECURITY
BRACKET AND THE FOAM TOP
WINDOW GASKET
Attach the security bracket with a type B
A
screw.
B
Cut the foam top window gasket to the
window width.
C
Stuff the foam between the glass and the
window to prevent air and insects from
getting into the room.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Asl24Asm24Asn24Asq24Asv24Asw18 ... Show all

Table of Contents