Samsung SGH-D807 Service Manual page 19

Gsm telephone
Hide thumbs Also See for SGH-D807:
Table of Contents

Advertisement

Test Command & Test Procedure
- 8PSK
1) Procedure:
a. Calibraion equipment HP8960 and the cell phone are connected
through RF cable.
b. Target power ( required power level according to the specification
which should be set by calibration program) is set to equipment as
power level (ex: GSM 8 level is 27 dBm).
c. Activate phone in Cont_8psk_Tx_Mode_Only.
d. HP8960 equipment measures transmitted power through rf test cable
from the phone and reports measured level to calibration program.
e. The program compares measured power with the target power.
f. The calibration program decides power code which is defined in
advance in the program and writes the codes to the flash memory in
the phone.
This Document can not be used without Samsung's authorization
SAMSUNG Proprietary-Contents may change without notice
6-3

Advertisement

Table of Contents
loading

Table of Contents