Do you have a question about the DRAFT GAUGE and is the answer not in the manual?
Questions and answers
Subscribe to Our Youtube Channel
Summary of Contents for Bacharach DRAFT GAUGE
Page 1
Inc. ’ s reason able satisfaction to have been defective; provided that written notice of the defect shall have been given by Buyer to Bacharach Inc. within one (1) year after the date of delivery of this Product by Bacharach, Inc. For full details concerning this warranty, contact Bacharach Inc.
For portable use, check zero each time the gauge is set up for use. For permanent installations (always dis- connect the hose from the gauge before making the zero check) Figure 1. Draft Gauge check zero at one or two week intervals.
Page 3
Parts List for the Draft Gauge 0013-0014 Scale +.05 <0> –.25” H 0013-0015 Scale +.05 <0> –1.0” H 0013-0016 Scale +1 <0> –25mm H 0013-0017 Scale +1 <0> –5mm H 0013-0159 Scale +1 <0> –15mm H 0013-0056 Leaf Spring Assembly for +.05” <0> –.25” or +1 <0> –5mm H...
Figure 4. Draft Gauge Locations Measuring Draft Figure 3. Mounting Draft Gauge Allow furnace to operate for several minutes, unwrap hose, place Locations for Checking Draft gauge on reasonably level surface, check zero, insert metal draft tube through draft hole. After about 30 seconds read draft from Furnace manufacturer may require measurement of draft (a) in gauge scale.
Need help?
Do you have a question about the DRAFT GAUGE and is the answer not in the manual?
Questions and answers