Download Print this page

Sony Ericsson Wiring loom Application Note

Wiring loom type approval on an orga sim simulator

Advertisement

Quick Links

Application Note
Wiring loom for GM/GR47/48
type approval on an Orga
SIM simulator
LZT 123 7912:R1A

Advertisement

loading

Summary of Contents for Sony Ericsson Wiring loom

  • Page 1 Application Note Wiring loom for GM/GR47/48 type approval on an Orga SIM simulator LZT 123 7912:R1A...
  • Page 2 First edition (May 2004) Sony Ericsson Mobile Communications. publishes this manual without making any warranty as to the content contained herein. Further Sony Ericsson Mobile Communications. reserves the right to make modifications, additions and deletions to this manual due to typographical errors, inaccurate information, or improvements to programs and/or equipment at any time and without notice.
  • Page 3 Wiring loom for type approval on an Orga SIM simulator Contents INTRODUCTION ......................... 4 WIRING LOOM ........................5 LZT 123 7912:R1A...
  • Page 4 Wiring loom for type approval on an Orga SIM simulator Introduction Most Type Approval houses will use an ORGA tester to test SIM functionality. In order to pass these tests the application developer must provide the unit under test wired for the ORGA tester (see next page).
  • Page 5 Wiring loom for type approval on an Orga SIM simulator 2 Wiring loom The application developer can do this in one of 3 three ways: 1. Layout the board with a male connector on it and the proper lines run to the connector. Run a female-to-female ribbon connector to the ORGA tester.

This manual is also suitable for:

Gr47Gr48Gm47Gm48