Kenmore THE ECONOMIZER 153.332070 Owner's Manual page 21

Power vented gas models with hot surface ignition
Hide thumbs Also See for THE ECONOMIZER 153.332070:
Table of Contents

Advertisement

B.Deburring
Use a knife, plastic pipe d eburnng
tool, or file toremove
burrs from the end
of s mall diameter
pipe. Be sure t o remove
all b urrs from around the inside
as well as the outside ofthe pipe. Aslight chamfer (bevel) of a bout IO °-
15 °should beadded to the end t opermit easier insertion
of t he pipe i nto
the end o fthe f itting. Failure
tochamfer
the edge o f t he pipe m ay r emove
cement from the fitting socket, causing
the joint toleak.
1(
STEP B
C. Test dry fit of the joint
Tapered fitting sockets are designed so that an interfaced fit should
occur when the pipe is inserted about 1/3 to 2/3 of the way into the
socket.
Occasionally,
when pipe fitting dimensions
are at the
tolerance extremes,
it will be poseible to fully insert dry pipe to the
bottom of the fitting socket. When this happens, a sufficient quantity
of cement must be applied to the joint to fill the gap between the pipe
and fitting. The gap must be filled to obtain a strong, leakofreeioint.
D. Inspection,
cleaning,
priming
Visually inspect the inside of the pipe and fitting sockets and remove
all dirt, grease
or moisture with a clean dry rag. If wiping fails to
clean the surfaces,
a chemical
cleaner must be used. Check for
possible damage such as splits or cracks and replace if necessary.
Depthoofoentry
Marking the depth of entry is a way to check if the pipehas reached
the bottom of the fitting socket in Step R Measure the fitting depth
and mark this distance
on the pipe O.D. You may want to add
several
inches to the distance
and make a second
mark as the
primer and cement will most likely destroy your first one.
Apply primer to the surface of the pipe and fitting socket with a natural
bristle brush. This process softens and prepares the PVC or CPMC for
the solvent cementing step. Move quickly and without hesitation to the
cementing procedure while the surfaces are still wet with primer.
E, Application
of solvent
cement
. Apply the selvent cement evenly and quickly around the outside of the
pipe at a width a little greater than the depth of the fitting socket.
. Apply a light coat of cement evenly around the inside of the
fitting socket. Avoid puddling.
• Apply a second coat of cement to the pipe end.
Cons of cement and primer should be closed at all
times when not in use to prevent evaporation of
chemicals and hardening of cement.
They are also very flammable and should be kept
away from heat or flame.
R Joint
assembmy
STEPE
Working
quickly, insert the pipe into the fitting socket bottom and
give the pipe or fitting a 1/4 turn to evenly distribute the cement. Do
not continue to rotate the pipe after it has hit the bottom of the fitting
socket. A good joint will have sufficient
cement to make a bead all
the way around the outside of the fitting hub. The fitting will have a
tendency
to slide back while the cement is still wet so hold the ioint
together for about 15 seconds.
G,
f,
STEPF
Cleanup
and joint
movement
Remove all excess cement from around the pipe and fitting with a
dry cotton rag. This must be done while the cement is still soft.
The ioint should not be disturbed immediately
after the cementing
procedure,
and sufficient time should be allowed for proper curing
of the joint. Exact drying time is difficult to predict because itdepends
on variables
such as temperature,
humidity and cement integrity.
For more specific
information,
you should
contact
your solvent
cement manufacturer.
STEPG
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

153.332060153.332050153.332040Economizer 6

Table of Contents