GE GSH25JSRISS Owner's Manual And Installation Instructions page 18

Models 20, 22 and 25
Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions
INSTALLING THE WATER LINE (cont.)
[] FASTEN THE SHUTOFF VALVE
Fasten
the shutoff
_al_e to the cold water pipe
with
the pipe clamp.
PipeClamp --_
Saddle-Type J
-VerticalCold
Shutoff Valve
Water Pipe
NOTE:
Commonwealth
of Massachusetts
Plmnbing
Codes
248CMR
shall be adhered
to. Saddle
wflves
are illegal
and
use is not permitted
in Massachusetts.
Consult
with wmr licensed
i)lmnber.
[]
TIGHTEN
THE PIPE CLAMP
Tighten
tile clamp
screws
until tile sealing
washer
begins
to swell.
NOTE:
Do not overtighten
or you mav c_ush tile
tubing.
Washer
Pipe Clamp __
!
J
Clamp Screw--
[] ROUTE THE TUBING
Route
tile tubing
between
tile cold water
line and
tile refl'igera
tot.
Route
tile tubing
through
a hole drilled
in tile wall
or floor
(behind
tile refrigerator
or a@_cent
base
cabinet)
as close
to the wall as possible,
NOTE:
Be sm'e there
is sufficient
extra
tubing
(about
8' [2.4 m] coiled
into
3 tm'ns
of about
10"
[25 cm] diameter)
to allow tile refl'igerator
to move
out fi'om the wall after installation.
[] CONNECT THE TUBING
TO THE VALVE
Place
the compression
nut and teHule
(sleexe)
for
coI)per
tubing
onto
tile end
of tile tubing
and
connect
it to tile shutoff
xalxe.
Make
sure tile tubing
is flflly inserted
into
tile valve.
Tighten
the compression
nut secm'elv.
For plastic
tubing
fl'om a GE Sn/art(_onnect
TM
Refl'igerator
Tubing
kit, insert
tile molded
end
of the tubing
into
the shutoff
wflve and
tighten
compression
nut tmtil
it is hand
tight,
then
tighten
one additional
turn with a wrench.
Overtightening
Ill}IV
Ca/ISe
leaks.
,ressi0nNut
Saddle-Type
Shutoff Valve
SmartC0nnect _
Tubing
PackingNut --
Outlet Valve --
--
Ferrule (sleeve}
NOTE:
Commonwealth
of Massachusetts
Phtml)ing
Codes
248CMR
shall be adhered
to. Saddle
wdves
are illegal
and
use is not permitted
in Massachusetts.
Consult
with yore" licensed
l_lmnl)e_:
[] FLUSH OUT THE TUBING
Turn
tile main
water supply
on and
flush out tile
tubing
tmtil tile water is clear.
Shut tile water
off at tile water
valve after about
one
quart
(l liter)
of water
has been
flushed
through
tile tubing.
18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gsh25jsribbGsh22jsrjss

Table of Contents