Oil furnace circulating fan upgrade kits (6 pages)
Summary of Contents for Crown Boiler CHB68-112L
Page 1
A qualified installer, service agency, or the oil supplier must perform installation and service. These instructions should be: • read prior to installation. • retained for qualified service personnel • reviewed before performing any service or maintenance. Crown Boiler Company 3633 “I” Street Philadelphia, Pennsylvania 19134 MO-432 ECN4514-MA...
Only qualified service personnel shall perform installation and service. c c c c CAUTION: • ONLY a qualified oil-heating contractor shall install and adjust this oil burner, using calibrated combustion test instruments, to ensure safe and reliable operation of the furnace. •...
Page 3
Only qualified service personnel shall perform installation and service. 1) Remove the oil burner from the shipping carton and remove any shipping materials adhering to the burner. Collect and save the burner mounting gasket and any instructions furnished with the burner. 2) If it is necessary to adjust the heating capacity of the furnace, by changing the oil burner nozzle, refer to the following directions.
Page 4
Only qualified service personnel shall perform installation and service. Figure 1: Side View of Correct Burner Insertion into Combustion Chamber 6) Reinstall the burner mounting plate, if removed, and push the burner flange gasket (included with the burner) on to the burner mounting plate threaded studs. Seat the gasket against the mounting plate.
Page 5
Only qualified service personnel shall perform installation and service. 8) The burner and wiring harness are equipped with mating, three (3) pole, quick- connect, electrical couplings. To make the connection between the burner wiring harness and the furnace wiring harness, open the burner junction box cover (the oil primary control serves as the cover) and remove a knockout slug from the right-hand side of the burner junction box.
Page 6
Only qualified service personnel shall perform installation and service. NOTICE: On the horizontal / counterflow furnace wiring harness, remove the lock-ring from the end of the flexible metal conduit connector BEFORE connecting the electrical couplings. 10) On the highboy and lowboy furnace wiring harnesses, snap the strain relief fitting into the knockout opening in the burner junction box.