Download Print this page

Allied Air 506299-01 User's Information Manual

Gas heating/electric cooling package unit

Advertisement

Quick Links

USER'S INFORMATION MANUAL
Gas Heating/Electric Cooling Package Unit
Congratulations...
...your outdoor heating/cooling package unit is a valuable
piece of equipment, designed and manufactured by the
most modern methods. Proper care of your unit should
result in many years of service and comfort.
To keep your operating costs low and to eliminate
unnecessary service calls, we have provided a few
guidelines. These guidelines will help you understand how
your heating/cooling unit operates and how to maintain it
so you can get years of safe and dependable service.
Read all the instructions in this manual, and keep all
manuals for future reference.
GAMA Certified
The Gas Appliance
Manufacturers Association
(GAMA) symbol verifies that
Annual Fuel Utilization Efficiency (AFUE) ratings for our
gas package heating/cooling units have been derived
from U.S. Government standard tests.
Manufactured By
ALLIED AIR ENTERPRISES, INC.
A Lennox International Inc. Company
215 Metropolitan Drive
West Columbia, SC 29170
*506299-01*
506299-01
RPGE/RGE Series
Save these instructions for future reference
FIRE OR EXPLOSION HAZARD
Failure to follow the safety warnings
exactly could result in serious injury,
death, or property damage.
- Do not store or use gasoline or other
flammable vapors and liquids in the vicinity
of this or any other appliance.
- What to do if you smell gas:
• Do not try to light any appliance.
• Do not touch any electrical switch; do not
use any phone in your building.
• Immediately call your gas supplier from a
neighbor's phone.
supplier's instructions.
• If you cannot reach the gas supplier, call
the fire department.
- Installation and service must be performed
by a qualified installer, service agency or
the gas supplier.

TABLE OF CONTENTS

OPERATING YOUR UNIT .................................... 3
MAINTENANCE OF YOUR UNIT .........................5
REPAIR PARTS ....................................................7
WARRANTY ......................................................... 8
Issue 0912
WARNING
Follow the gas
Page 1

Advertisement

loading

Summary of Contents for Allied Air 506299-01

  • Page 1: Table Of Contents

    (GAMA) symbol verifies that Annual Fuel Utilization Efficiency (AFUE) ratings for our gas package heating/cooling units have been derived from U.S. Government standard tests. Manufactured By ALLIED AIR ENTERPRISES, INC. A Lennox International Inc. Company 215 Metropolitan Drive West Columbia, SC 29170 *506299-01*...
  • Page 2: Important Safety Information

    Issue 0912 such as the vent hood, are clear and free of obstructions. sound and sealed to the unit casing. sagging, cracks, gaps, etc. the unit. Burner Flame beginning on page 6). 506299-01...
  • Page 3: Operating Your Unit

    Knob Gas Control Switch Figure 1 506299-01 7. Wait 5 minutes to clear out any gas, then smell for gas (including at the bottom of the unit near the ground). If you smell gas, stop and follow the directions in WHAT TO DO IF YOU SMELL GAS on page 1.
  • Page 4 “ON” position. 2. Replace any burned-out fuses or reset circuit breakers. 3. Be sure the thermostat is properly set. Cooling & If the unit still does not start, call a qualified service technician. Heating Temperature Setting Issue 0912 506299-01...
  • Page 5: Maintenance Of Your Unit

    As part of your inspection, you should start the unit. The vent motor should start and purge the system for 30 seconds. After the prepurge time, the burners should ignite. 506299-01 If the burner does not ignite, contact a qualified service technician for assistance.
  • Page 6 The gas supply to the unit should be shut off and no attempt should be made to place it in operation. The system should be inspected by a qualified service technician. Issue 0912 506299-01...
  • Page 7: Repair Parts

    Fan control board Rollout switch Ignition control Cooling Group Compressor Coil Fan motor Drain pan Fan blade Contactor 506299-01 Owner Record Model # _________________________________ Serial # _________________________________ Installation Date ___________________________ Installed by: Dealer __________________________________ Address _________________________________ Telephone # ______________________________ License # ________________________________...
  • Page 8: Warranty

    FAILURE TO MAINTAIN YOUR EQUIPMENT WILL VOID THIS WARRANTY COVERED EQUIPMENT The following Allied Air Enterprises heating and cooling equipment is covered by the Limited Warranty, Condensing Units: 2SCU13, 4SCU13, 4SCU14, 4SCU16, 4SCU18, 2AC13, 2AC14, 4AC13, 4AC14 Heat Pumps: 2SHP13, 4SHP13, 2SHP14, 4SHP14, 4SHP16, 4SHP18, 2HP13, 2HP14, 4HP13, 4HP14...
  • Page 9 5-YEAR LIMITED EXTENDED PARTS WARRANTY Allied Air Enterprises Inc. (“Allied Air”) provides its air conditioning and heating products with a Standard Limited Parts Warranty for five (5) years. This additional 5-Year Limited Extended Parts Warranty is in addition to and is intended to supplement Allied Air’s Standard Limited Parts Warranty. As such, Allied Air provides for a total of 10- years of limited warranty coverage (Standard Limited Parts Warranty plus additional 5-Year Limited Extended Parts Warranty).
  • Page 10 NOTES Page 10 Issue 0912 506299-01...

This manual is also suitable for:

Rpge seriesRge series